American Dryer Corp ID-170 installation manual

Page 17

3.Exhaust Ductwork

NOTE: A transition piece for the exhaust is shipped inside the basket (tumbler). This transition piece is for locations with round exhaust ductwork.

a.To install the transition piece, align the four (4) clinch studs into the four (4) clearance holes on the dryer.

b.Using the four (4) free spin wash nuts (included with the transition piece), tighten the wash nuts on the clinch studs, which will secure the transition piece to the dryer.

c.The round duct can now be connected to the dryer.

13

Image 17
Contents ID-170 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page Page Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Page Electrical Requirements Electrical InformationIDG-170 Gas IDS-170 Steam Page Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationSteam Damper System Compressed AIR Pressure Page Preparation for OPERATION/START-UP Electric Service ExactlyPreoperational Tests Basket Coating Page Compressed AIR Pressure AIR Supply Compressed AIR RequirementsShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationSerial Number Procedure for Functional Check Replacement Components P O RTA N T ADC 113331 1 08/27/01-25