American Dryer Corp MDG-30 installation manual Preparation for Operation and START-UP

Page 30

H. PREPARATION FOR OPERATION AND START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the upper left side panel area behind the top control (access) door.

3.Check to assure that the dryer is connected to the type of heat or gas indicated on the dryer data label.

4.The sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.Check bolts, nuts, screws, terminals, and fittings for tightness.

6.Be sure that ALL gas shutoff valves are in the open position.

7.Check ALL back guard panels and service box covers have been replaced.

8.Make sure the lint coop support bracket has been removed.

9.Check the lint door to assure that it is closed and secured in place.

IMPORTANT: If during installation the lint door safety chain was disconnected, it must be reconnected or personal injury may result.

10.Rotate the basket (tumbler and drum) by hand to be sure it moves freely.

11.Check bolts, nuts, screws, terminals, and fittings for security.

12.Check basket (tumbler) bearing setscrews to ensure that they are ALL tight.

26

Image 30
Contents MDG-30 Coin Installation Manual Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASPage Specifications SpecificationsSpecifications GAS only Installation Procedures Unpacking and Setting UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Vertical Venting Multiple Dryer Common Venting Illus. D Importantventingreminders Electrical Information Electrical RequirementsMust be Provided Single-Phase 1ø Electrical Connections Leads GAS 120GAS Information Kcal/hr Rating 22,680 This Pipe Size Requirement Page Preparation for Operation and START-UP Preoperational Tests Preoperational Instructions Basket Tumbler CoatingPage Select Temperature Shutdown Instructions SERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationTroubleshooting No light emitting diode L.E.D. displayDrive motor is not operating does not start Blower motor is not operating does not start Microprocessor controller computer display reads dSFLMicroprocessor controller computer display reads door No heat, ignitor sparks, burner goes on and off right awayDryer operates but is taking too long to dry Condensation on main door glass Dryer is making scraping noise at basket tumbler areaExcessive noise or vibration Heating unit is not operating all temperature selections Main burners are burning with a yellow flameDryer operates but is taking too long to dry load Dryer is cycling on hi-limit thermostat Datalabel Information Data LabelSerial Number Procedure for Functional Check Replacement Components Page Page Burner Manual Reset HI-LIMIT Instructions 12/15/99-150