American Dryer Corp ML-75V installation manual Dryer Enclosure Requirements

Page 15

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and service above the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.

NOTE: Allowances must be made for opening the control door.

Dryers may be positioned sidewall to sidewall. However, a 1/16” (1.5875 mm) minimum allowance must be made for the opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 30-inches (76.2 cm) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard.) Refer to the illustration above for details.

NOTE: Air considerations are important for proper and efficient operation.

IMPORTANT: For overhead clearance, even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72 cm) or more is suggested. The additional clearance is advantageous for ease of installation and service.

IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is required. Dryers may be positioned sidewall to sidewall however, a 1/16” (1.5875 mm) minimum allowance is required between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closing of the control door and the lint door.

11

Image 15
Contents ML-75V Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsOutside Ductwork Protection Page Page Page Electrical Requirements Electrical InformationGas and Steam Models Only Page Single-Phase Electrical Lead Connections Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Dual Timer Dryers Reversing Timer SPIN/DWELL AdjustmentsShutdown Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceLubrication AdjustmentsProcedure for Functional Check Replacement Components Page Data Label Information Serial Number Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer Fire Suppression System F.S.S S. In ActionBefore YOU Start Check Local Codes and Permits InstallationTypical water supply Optional Manual Bypass S. Theory of Operation S. Water Valve Check Starting a Cycle When Computer is in F.S.S. is Disabled Mode ADC Part No 05/26/05