American Dryer Corp ML-75V installation manual

Page 26

2)3-Phase (3ø) Wiring Connections/Hookup

The electrical connections on ALL 3-phase (3ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer. The electrical connections are made at the power distribution block located in the service box. The ground connection is made to the copper lug, also provided in this box. To gain access, the service box cover must be removed.

The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.

b.Electrically Heated Models Only

The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral) and ground. Single-phase (1ø) power for the control circuit and for any single-phase (1ø) motors (if present) is done internally to the dryer by the factory at the oven contactor. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.

CAUTION: The dryer must be grounded. A ground lug has been provided for this purpose.

Input connection wiring must be sized properly to handle the dryer’s current draw. This information is printed on the dryer’s data label.

The electrical input connections are made at the electric oven contactor located inside the assembly at the rear center upper section of the dryer. The ground connection is made to a copper lug also provided in this area. To gain access, remove oven rear service cover.

IMPORTANT: A strain relief must be used where the input wiring enters the oven assembly.

22

Image 26
Contents ML-75V Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationOutside Ductwork Protection Page Page Page Electrical Information Electrical RequirementsGas and Steam Models Only Page Single-Phase Electrical Lead Connections Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Shutdown Instructions Dual Timer DryersReversing Timer SPIN/DWELL Adjustments Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Data Label Information Serial Number Dual Timer Manual Reset Burner HI-LIMIT InstructionsPhase S. In Action Fire Suppression System F.S.SInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass S. Theory of Operation S. Water Valve Check Starting a Cycle When Computer is in F.S.S. is Disabled Mode ADC Part No 05/26/05