American Dryer Corp ML-75V Section Procedure for Functional Check of Replacement

Page 6

SECTION VII

 

PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT

 

COMPONENTS

42

SECTION VIII

 

DATA LABEL INFORMATION

44

SECTION IX

 

MANUAL RESET BURNER HI-LIMIT INSTRUCTIONS

46

A. Phase 7

46

B. Dual Timer

46

SECTION X

 

FIRE SUPPRESSION SYSTEM (F.S.S.)

47

Image 6
Contents ML-75V Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationOutside Ductwork Protection Page Page Page Electrical Information Electrical RequirementsGas and Steam Models Only Page Single-Phase Electrical Lead Connections Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Dual Timer Dryers Reversing Timer SPIN/DWELL AdjustmentsShutdown Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Data Label Information Serial Number Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer S. In Action Fire Suppression System F.S.SInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass S. Theory of Operation S. Water Valve Check Starting a Cycle When Computer is in F.S.S. is Disabled Mode ADC Part No 05/26/05