American Dryer Corp ML-75V installation manual

Page 21

17

Image 21
Contents ML-75V Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust Requirements Outside Ductwork Protection Page Page Page Electrical Requirements Electrical InformationGas and Steam Models Only Page Single-Phase Electrical Lead Connections Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Dual Timer Dryers Reversing Timer SPIN/DWELL AdjustmentsShutdown Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceLubrication AdjustmentsProcedure for Functional Check Replacement Components Page Data Label Information Serial Number Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer Fire Suppression System F.S.S S. In ActionBefore YOU Start Check Local Codes and Permits InstallationTypical water supply Optional Manual Bypass S. Theory of Operation S. Water Valve Check Starting a Cycle When Computer is in F.S.S. is Disabled Mode ADC Part No 05/26/05