American Dryer Corp ML-75V installation manual

Page 30

Consistent gas pressure is essential at ALL gas connections. It is recommended that a 3/4-inch (19.05

mm)pipe gas loop be installed in the supply line servicing a bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches (29.9 mb) of water column (W.C.) pressure.

NOTE: A water column test pressure of 3.5 inches (8.7 mb) for natural gas and 10.5 inches (26.1 mb) for liquid propane (L.P.) dryers is required at the gas valve pressure tap of each dryer for proper and safe operation.

An 1/8” N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent works well).

WARNING: NEVER TEST FOR LEAKS WITHA FLAME!!!

ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P. Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by a qualified professional. It is important that gas pressure regulators meet applicable pressure requirements, and that gas meters be rated for the total amount of ALL the appliance Btus being supplied.

IMPORTANT: The dryer and its individual shutoff valve must bedisconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure test of the gas supply system at test pressures equal to or less than 1/2 psig (3.5 kPa).

26

Image 30
Contents ML-75V Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork InformationOutside Ductwork Protection Page Page Page Electrical Information Electrical RequirementsGas and Steam Models Only Page Single-Phase Electrical Lead Connections Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed Air Supply Air Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Dual Timer Dryers Reversing Timer SPIN/DWELL AdjustmentsShutdown Instructions SERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningAdjustments LubricationProcedure for Functional Check Replacement Components Page Data Label Information Serial Number Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer S. In Action Fire Suppression System F.S.SInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass S. Theory of Operation S. Water Valve Check Starting a Cycle When Computer is in F.S.S. is Disabled Mode ADC Part No 05/26/05