American Dryer Corp ML-75DII installation manual Unpacking/Setting Up

Page 15

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

B. UNPACKING/SETTING UP

Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.

IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.

The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the dryer, locate and remove the four (4) bolts securing the base of the dryer to the wooden skid. Two (2) are at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint chamber. To remove the two (2) bolts located in the lint chamber area, remove the lint door.

With the skid removed, to make it easier to slide the dryer into its final position, slightly lower ALL four (4) leveling legs, so that the dryer will slide on the legs instead of the base frame.

To increase bearing life and improve efficiency, the dryer should be tilted slightly to the rear.

IMPORTANT: For microprocessor controller (computer) models, this wooden block must be removed before connecting power to the dryer or irreparable damage to the basket (tumbler) will result.

The lint coops of ALL ML-75 dryers are supported during shipping by a bracket. REMOVE THIS BRACKET BEFORE STARTING THE DRYER.

1.Leveling Dryer

The dryer is equipped with four (4) leveling legs, one (1) at each corner of the base. Two (2) are located at the rear of the dryer base, and two (2) are located in the lint chamber (coop). To increase bearing life and improve efficiency, the dryer should be tilted slightly to the rear.

11

Image 15
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsPage Page Page Page Electrical Requirements Electrical InformationMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceDays Lubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationData Label P O RTA N T Manual Reset HI-LIMIT InstructionsFor Phase 6 Models Electric or Steam Models only