American Dryer Corp ML-75DII installation manual Dryer Enclosure Requirements

Page 16

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12- inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and service above the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 1-inch (2.54 cm) clearance is required.

NOTE: Allowances must be made for opening the control door.

Dryers may be positioned sidewall to sidewall. However, a 1/16-inch (1.5875 mm) minimum allowance must be made for the opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 30-inches (76.2 cm) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard.) Refer to the illustration above for details.

NOTE: Air considerations are important for proper and efficient operation.

IMPORTANT: For overhead clearance, even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72 cm) or more is suggested. The additional clearance is advantageous for ease of installation and service.

IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is required. Dryers may be positioned sidewall to sidewall however, a 1/16-inch (1.5875 mm) minimum allowance is required between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closing of the control door and the lint door.

12

Image 16
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Section Important InformationSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Horizontal VentingPage Page Page Page Electrical Information Electrical RequirementsMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningDays Adjustments LubricationProcedure for Functional Check Replacement Components Page Page Reversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelData Label Manual Reset HI-LIMIT Instructions P O RTA N TFor Phase 6 Models Electric or Steam Models only