I. PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the left side panel/wall area behind the control door. In the case of 208 VAC or 240 VAC, THE SUPPLY VOLTAGE MUST MATCH THE ELECTRIC SERVICE EXACTLY .

3.GAS MODELS - Check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS & ELECTRIC MODELS - The sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning. (refer to Sail Switch Adjustment on page 37).

5.GAS MODELS - Be sure that ALL gas shutoff valves are in the open position.

6.Be sure ALL side and base panels are on the dryer.

7.Check ALL service doors to insure that they are closed and secure.

8.Be sure the lint door is securely in place.

9.Rotate the basket (tumbler/drum) by hand to be sure it moves freely.

10.Check bolts, nuts, screws, terminals, and fittings for security.

11.STEAM MODELS - Check to insure air supply (80 PSI [5.51 bars]) is connected to the dryers.

12.STEAM MODELS - Check to insure ALL steam shutoff valves are open.

13.STEAM MODELS - Check steam damper operation.

14.Check basket (tumbler) bearing setscrews to insure they are ALL tight.

35

Image 39
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsPage Page Page Page Electrical Requirements Electrical InformationMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceDays Lubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationData Label P O RTA N T Manual Reset HI-LIMIT InstructionsFor Phase 6 Models Electric or Steam Models only