American Dryer Corp ML-75DII installation manual Compressed AIR Supply AIR Pressure

Page 37

a. Air Requirements

COMPRESSED AIR SUPPLY

AIR PRESSURE

 

 

 

Normal

80 PSI

5.51 bars

 

 

 

Minimum Supply

70 PSI

4.82 bars

 

 

 

Maximum Supply

90 PSI

6.20 bars

 

 

 

Shaded areas are stated in metric equivalents

 

 

b.Air Connection

Air connection to system --- 1/8-inch N.P.T.

c.No air regulator or filtration is provided with the dryer. External regulation/filtration of 80 PSI (5.51 bars) must be provided. It is suggested that a filter/regulator/gauge (F/R/G) arrangement be added to the compressed air line just before the dryer connection. This is necessary to insure that correct and clean air pressure is achieved.

5.Steam Damper System Operation

The MLS-75 steam damper shown in Diagram 1 in the illustration below, allows the coil to stay constantly charged eliminating repeated expansion and contraction. When the damper is opened, the air immediately passes through the already hot coil, providing instant heat to start the drying process. When the damper is closed, ambient air is drawn directly into the basket (tumbler), allowing a rapid cool down (Diagram 2).

Diagram 1 shows the damper in the heating (open) mode, allowing heat into the basket (tumbler).

Diagram 2 shows the damper in the cool down (closed) mode, pulling ambient air directly into the basket (tumbler) without passing through the coils.

NOTE: With the dryer off or with no air supply, the steam damper is in cool down mode as shown in Diagram 2.

33

Image 37
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsPage Page Page Page Electrical Requirements Electrical InformationMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceDays Lubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationData Label P O RTA N T Manual Reset HI-LIMIT InstructionsFor Phase 6 Models Electric or Steam Models only