American Dryer Corp ML-75DII installation manual MLE-75 Electric

Page 25

b. Electric Models Only

MLE-75 (ELECTRIC)

ELECTRICAL SERVICE SPECIFICATIONS (PER DRYER)

IMPORTANT: 208 VAC and 240 VAC ARE NOT THE SAME . When ordering, specify exact voltage.

NOTES: A. Fuse ratings are dual element, time delay, current limiting, class RK1 or RK5 ONLY.

B.Circuit breakers are thermal/magnetic (industrial) motor curve type ONLY. For others, calculate/verify correct breaker size according to appliance amp draw rating and type of breaker used.

C.Circuit breakers for 3-phase (3ø) dryers must be 3-pole type.

APPLIED VOLTAGE/PHASE

KW

20

24

30

33

36

40

APPROX. AMP DRAW

208/1ø (60 Hz)

240/1ø (60 Hz)

208/3ø (60 Hz)

240/3ø (50/60 Hz)

380/3ø (50 Hz)

416/3ø (50 Hz)

460/3ø (60 Hz)

104

90

---

---

33

---

---

 

 

 

 

 

 

 

---

---

72

63

---

36

33

 

 

 

 

 

 

 

---

---

88

77

---

45

41

 

 

 

 

 

 

 

---

---

---

---

53

---

---

 

 

 

 

 

 

 

---

---

105

92

---

53

48

---

---

---

---

---

59

---

 

 

 

 

 

 

 

IMPORTANT: Figures shown are for non-reversing models only. For reversing models contact the factory.

IMPORTANT: The dryer must be connected to the electric supply shown on the data label that is affixed to the left side panel/wall area behind the control door. In the case of 208 VAC or 240 VAC, the supply voltage must match the electric service specifications of the data label exactly.

IMPORTANT: The wire size must be properly sized to handle the related current.

WARNING: 208 VAC and 240 VAC ARE NOT THE SAME. Any damage done to dryer components due to improper voltage connections will automatically VOID THE WARRANTY.

NOTE: ADC reserves the right to make changes in specifications at any time without notice or obligation.

IMPORTANT: 3-phase (3ø) figures shown are for a 3-wire service only.

21

Image 25
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsPage Page Page Page Electrical Requirements Electrical InformationMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceDays Lubrication AdjustmentsProcedure for Functional Check Replacement Components Page Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Data Label InformationData Label P O RTA N T Manual Reset HI-LIMIT InstructionsFor Phase 6 Models Electric or Steam Models only