American Dryer Corp ML-75DII installation manual

Page 52

e. Open main door. The dryer must stop and ALL output indicator lights on the back side of the microprocessor controller (computer) board must go out. (Refer to the illustration on the previous page.)

f.Try to restart the dryer with the main door open.

g.The microprocessor controller (computer) board’s light emitting diode (L.E.D.) display must read “DOOR.”

h.Close the main door and restart the dryer.

i.Functional check of microprocessor controller (computer) board is complete.

2.For models with Johnson Controls Direct Spark Ignition (DSI) Module (G760)

Theory Of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open...as long as there is a call for heat. The DSI module will “LOCKOUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30- seconds) the DSI module will “LOCKOUT” (L.E.D. flashes).

A steady L.E.D. indicator indicates normal operation.

No L.E.D. indicator indicates a power or an internal failure has occurred.

48

Image 52
Contents ML-75DII Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Section Important InformationSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Horizontal VentingPage Page Page Page Electrical Information Electrical RequirementsMLS-75 Steam MLE-75 Electric Page Single-Phase 1Ø Electrical Connections Leads Page Page Page GAS Information Type of GAS Page Steam Information Operating Steam Pressure Page Compressed AIR Supply AIR Pressure Page Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningDays Adjustments LubricationProcedure for Functional Check Replacement Components Page Page Reversing Timer SPIN/DWELL Adjustments Timing LegendData Label Information Data LabelData Label Manual Reset HI-LIMIT Instructions P O RTA N TFor Phase 6 Models Electric or Steam Models only