American Dryer Corp AD-24 Phase 7 installation manual Single-Phase Electrical Lead Connections

Page 23

Single-Phase Electrical Lead Connections

Black

+

Positive

White or Red

+

Neutral or L2

Green

+

Ground

FOR 110V APPLICATIONS

FOR 208-240V APPLICATIONS

A ground lug is provided in the rear electrical box to connect your service ground.

113222 - 5

www.amdry.com

19

Image 23
Contents AD-24 Installation Manual Retain This Manual in a Safe Place for Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Section Safety PrecautionsAmerican Dryer Corp 113222 71.91 cm SpecificationsSpecifications Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Single Dryer Venting 113222 American Dryer Corp 113222 Important Venting Reminders Electrical Requirements Electrical InformationGas American Dryer Corp 113222 Single-Phase Electrical Lead Connections American Dryer Corp 113222 GAS Information Type of GAS Do not Reduce this Pipe Size Requirement Preoperational Tests Preparation for OPERATION/START-UPBasket Tumbler Coating Preoperational Instructions Coin Models NON-COIN Models Dual Timer DryersShutdown Instructions Reversing Timer SPIN/DWELLADJUSTMENTSParts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Warranty113222 Suggested Cleaning Schedule Routine MaintenanceCleaning Lubrication AdjustmentsData Label Information Heat Input for GAS Dryers Data Label Model NumberProcedure for Functional Check Replacement Components 113222 American Dryer Corp 113222 Sensor Activated Fire Extinguishing S.A.F.E. System F.E. System In ActionBefore YOU Start Check Local Codes and Permits InstallationTypical water supply Optional Manual Bypass F.E. System Theory of Operation F.E. System Water Valve Check F.E. System Diagnostics Messages ADC Part No 06/03/08