American Dryer Corp AD-24 Phase 7 installation manual ADC Part No 06/03/08

Page 50

ADC Part No. 113222

5 - 06/03/08 - 100

Image 50
Contents AD-24 Installation Manual Retain This Manual in a Safe Place for Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Safety Precautions SectionAmerican Dryer Corp 113222 Specifications 71.91 cmSpecifications Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Single Dryer Venting 113222 American Dryer Corp 113222 Important Venting Reminders Electrical Information Electrical RequirementsGas American Dryer Corp 113222 Single-Phase Electrical Lead Connections American Dryer Corp 113222 GAS Information Type of GAS Do not Reduce this Pipe Size Requirement Preparation for OPERATION/START-UP Preoperational TestsBasket Tumbler Coating Preoperational Instructions Coin Models Dual Timer Dryers NON-COIN ModelsReversing Timer SPIN/DWELLADJUSTMENTS Shutdown InstructionsParts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty Parts113222 Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationData Label Information Data Label Model Number Heat Input for GAS DryersProcedure for Functional Check Replacement Components 113222 American Dryer Corp 113222 F.E. System In Action Sensor Activated Fire Extinguishing S.A.F.E. SystemInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass F.E. System Theory of Operation F.E. System Water Valve Check F.E. System Diagnostics Messages ADC Part No 06/03/08