American Dryer Corp AD-24 Phase 7 installation manual American Dryer Corp 113222

Page 22

3.Grounding

A ground (earth) connection must be provided and installed in accordance with state and local codes. In the absence of these codes, grounding must conform to applicable requirements of the National Electrical Code ANSI/NFPA NO. 70-LATEST EDITION, or in Canada, the installation must conform to applicable Canada Standards: Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION. The ground connection may be to a proven earth ground at the location service panel.

For added personal safety, when possible, it is suggested that a separate ground wire (no. 18 minimum) be connected from the ground connection of the dryer to a grounded cold water pipe. DO NOT ground to a gas pipe or hot water pipe. The grounded cold water pipe must have metal-to-metal connection ALL the way to the electrical ground. If there are any nonmetallic interruptions, such as, a meter, pump, plastic, rubber, or other insulating connectors, they must be jumped out with no. 4 copper wire and securely clamped to bare metal at both ends.

IMPORTANT: For personal safety and proper operation, the dryer must be grounded.

Provisions are made for ground connection in each dryer at the electrical service connection area.

4.Electrical Connections

A wiring diagram is located inside the control box for connection data.

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

a. Gas Models Only

IMPORTANT: A separate protected circuit must be provided to each dryer.

1)Single-Phase (1ø) Wiring Connections/Hookup

The electrical input connections on ALL single-phase (1ø) gas dryers are made into the rear service box located at the upper left area of the dryer.

18

American Dryer Corp.

113222 - 5

Image 22
Contents AD-24 Installation Manual Retain This Manual in a Safe Place for Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check Safety Precautions SectionAmerican Dryer Corp 113222 Specifications 71.91 cmSpecifications UNPACKING/SETTING UP Installation ProceduresLocation of the Dryer Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Single Dryer Venting 113222 American Dryer Corp 113222 Important Venting Reminders Electrical Information Electrical RequirementsGas American Dryer Corp 113222 Single-Phase Electrical Lead Connections American Dryer Corp 113222 GAS Information Type of GAS Do not Reduce this Pipe Size Requirement Preparation for OPERATION/START-UP Preoperational TestsBasket Tumbler Coating Preoperational Instructions Coin Models Dual Timer Dryers NON-COIN ModelsReversing Timer SPIN/DWELLADJUSTMENTS Shutdown InstructionsService SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty Parts113222 Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationData Label Information Data Label Model Number Heat Input for GAS DryersProcedure for Functional Check Replacement Components 113222 American Dryer Corp 113222 F.E. System In Action Sensor Activated Fire Extinguishing S.A.F.E. SystemInstallation Before YOU Start Check Local Codes and PermitsTypical water supply Optional Manual Bypass F.E. System Theory of Operation F.E. System Water Valve Check F.E. System Diagnostics Messages ADC Part No 06/03/08