Teledyne IGE 3000 instruction manual Installation, Receiving Inspection, Mounting, Grounding

Page 8

3. Installation

3.1.INSTALLATION

3.2.Receiving Inspection

Your instrument has been manufactured, calibrated and carefully packed so that upon receiving your order it is ready for operation. However, when you unpack, please inspect all items for any obvious signs of damage due to shipment. Immediately advise Teledyne Hastings and the carrier if any damage is suspected.

Use the packing slip as a check list and insure all parts are present including any optional equipment and that the options are correct (i.e. output, range, gas, pin out)

If a return is necessary, obtain an RMA (Return Material Authorization) number from our Customer Service Department at 1-800-950-2468.

3.3.Mounting

The IGE-3000 is an “indoor use only” instrument. The IGE-3000 can be mounted in any attitude or position. Reasonable care should be taken to install the IGE-3000 where it will be protected from physical damage. To facilitate ease of reading the LED readout, the connector “keyway” of the B/A tube should be mounted at the 3 o-clock position.

3.4.Grounding

For safety reasons the case of the IGE-3000 must be grounded to the vacuum chamber.

This is normally accomplished mechanically through the vacuum chamber base flange via the B/A tube physical connection. The electronics module is grounded through a pin in the

connector plug once the IGE-3000 module is plugged into the B/A tube. To ensure the best grounding possible, ensure that the tube to base set screw is fully tightened once the IGE-3000 is installed.

DANGER

Ion producing equipment such as the IGE-3000, from any manufacturer, may, under some conditions provide sufficient conduction via plasma to couple a high voltage electrode to the vacuum chamber. If conductive parts of the chamber are not grounded, they may attain a potential near that of the high voltage electrodes during this coupling. Potentially fatal electrical shock could then occur because of the high voltage between these vacuum chamber parts and ground. Grounding, though simple, is imperative! Ensure that the ground circuits are correctly utilized, both on your IGE-3000 power supplies and your vacuum chambers, regardless of the manufacturer, for this phenomenon is not peculiar to the IGE-3000.

IGE 300

Page 8 of 21

Image 8
Contents Teledyne Hastings Manual Print History Table of Contents IGE Quick Start Information To Turn on the TUBE’S FilamentsSpecifications General InformationGeneral Information IGE-3000 Mini Bayard/Alpert B/A TubeMaterials exposed to Vacuum Installation InstallationReceiving Inspection MountingConnector Electrical Pin outs B/A Tube InstallationMounting B/A tube to IGE-3000 Electronics Module EnvironmentalApply Power OperationOperation Front Panel OverviewOperating Modes DGas Mode Factor ModeFil filament Mode SP set point ModeRemote Filament Control Theory of Operation Bayard Alpert B/A TubeSet Up Guide Advance Setup GuideRS485 Address Baud RateTurnaround Delay Restore EepromData Bits/Parity Bits/Stop Bits Save EepromRS232/RS485 Wiring for IGE-3000 RS232/485 Wiring for RS232/485RS 232/RS ION Gauge Device Status 4-DIGIT Octal Word Command SyntaxDevice Status Command Description Format Sample Response Interrogation CommandsParameter Modification Commands Warranty Repair Policy Non-Warranty Repair PolicyDrawings & Schematics
Related manuals
Manual 21 pages 27.57 Kb