Stovax PR0696 manual Oxygen Depletion Sensor, Flame Failure Device, 10. ‘RUNNING IN’, Servicing

Page 7

USER INSTRUCTIONS

13

AR1171

7.14Working from the outer edges, place the second

row of pebbles against the rear of the first row. Note the orientation of each pebble, as this is important to the performance of the fire. See diagram 14.

14

AR1172

7.15Place the rear row of pebbles on top of the flame baffle, these must touch the rear panel. See diagram 15.

15

AR1173

7.16Place the remaining five pebbles between the second and rear rows. See diagram 16.

16

6 5 4 5 2

AR1174

8.OXYGEN DEPLETION SENSOR

8.1The appliance is fitted with an oxygen sensitive pilot system which acts to cut off the gas supply to the fire should the oxygen in the room fall below its normal level. If the fire is turned off by this device, it usually indicates that there is a problem with the flue system, and this should be inspected by a qualified engineer. Do not attempt to use the fire until an engineer says it is safe to do so.

This device is not a substitute for an independently mounted carbon monoxide detector.

9.FLAME FAILURE DEVICE

9.1This is a safety feature incorporated in all GAZCO fires which automatically switches off the gas supply if the pilot light goes out and fails to heat the thermocouple.

10.‘RUNNING IN’

10.1The surface coating on the coals used in your GAZCO fire will ‘burn off’ during the first few hours of use, producing a harmless and temporary odour. This will disappear after a short period of use. If the odour persists, ask your installer for advice.

11.SERVICING

11.1This fire must be serviced every 12 months by a qualified Gas Engineer. In all correspondence, always quote the appliance type and serial number, which may be found on the data badge located on a chain beneath the control valve.

12.VENTILATION

12.1Any purpose provided ventilation should be checked periodically to ensure that it is free from obstruction.

13.INSTALLATION DETAILS

13.1To assist in any future correspondence, your installer should have completed this commissioning sheet, this records, the essential installation details of the appliance. In all correspondence always quote the Model Number and Serial Number.

7

Image 7
Contents Logic Hotbox & Convector Fire Contents FLUE CHECK APPLIANCE COMMISSIONING CHECKLISTGAS CHECK Lighting the Fire with a Match User InstructionsLighting the Fire Turning the Fire OFFArrangement of Fuel BED Components Cleaning the FireCoal Layout Front ROW Coal Layout Using Flat Fire Fronts 10. ‘RUNNING IN’ Installation DetailsOxygen Depletion Sensor Flame Failure DeviceTechnical Specification Installation InstructionsMinimum Debris Collection Flue and Chimney Requirements Site RequirementsAppliance Location GAS Supply Installation Cable Retention Method Installation of the ApplianceScrew Fixing Method AR1163 AR1160 AR1174 AR1171 Commissioning Installation / CommissioningServicing Servicing InstructionsServicing Requirements Servicing Instructions Fault Finding Charts Fault Finding Charts General Replacing PartsIgnition Lead Gas valve Mag unit 9th Service 10th Service Service Records