4 X
13Front Fascia Installation
Attach front fascia to center of support beam. Slide top of fascia up under sup- port beam as shown, resting bottom on bottom shelf. Fasten with (4) #14 x 1/2” screws.
PROPANE ONLY |
14Tank Inhibitor Rod Installation
Insert one end of tank inhibitor rod into hole in back panel and other end into hole in back side of fascia as illustrated.
20