Venting Installation

instructions

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent instal- lation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Hori- zontal installations using round termination require exterior portion of wall firestop (see Figure 14, page 11).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installa- tions require sliding the fireplace in and out of position to make final venting connections. Figures 14 through 18 on pages 11 through 13 show different configurations for venting with horizontal termination that will help you decide which application best suits your installation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approximately one-quar- ter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue collar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassem- blies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

WARNING: Do not recess vent termination into any wall. This will cause a fire hazard.

Male

Slots

Female

Locking Lugs

Figure 8 - Vent Pipe Connections

Vent Opening

 

Combustible Wall

10 3/4" Inside Framing

10 3/4"

 

10 3/4"

 

(Framing

Vent Opening

Detail)

 

Noncombustible Wall

 

8 1/2"

 

 

Center

 

of Hole

Figure 9 - Vent Opening Requirements

116647-01Bwww.desatech.com

Image 9
Contents What to do if YOU Smell GAS Safety Information Table of ContentsSafety Information Product Features Product IdentificationLocal Codes Location and space requirements Pre-Installation PreparationClearances Flush with a wallFraming and finishing Termination CAP AIR Supply Inlet GAS Meter Location of Termination CapInstallation Precautions Venting Installation InstructionsMale Slots Female Locking Lugs Installation PlanningCenter HoleNoncombustible Exterior Vent Cap Wood ScrewVenting Installation Square TerminationHorizontal H 43 3/4 min None Wall Firestop Elbow53 3/4 min 65 3/4 minMin Max 12 max 18 max 20 max Elbow Venting with Two 90 ElbowsVertical V Horizontal H Min Max 12 max 18 max Elbow 20 maxFlat Ceiling Installation Installation for vertical terminationRoof Flashing Wall Strap Elbow Ceiling Firestop If area above is aMin Max 20 max Elbow Venting with One 90 Elbow Vertical V Horizontal HMin Max 12 max 18 max 20 max Parts list for venting kits and components High Altitude InstallationVertical Venting = 40 max ElbowInstalling optional blower accessory Fireplace InstallationModel BK Installation Check GAS TypeWiring Diagram Decal 12 in Front Blower Model BKT InstallationRight outside Blower Model BKT Blower Wiring DiagramInstallation Items Needed Installing Gas Piping to Fireplace LocationConnecting Fireplace to GAS Supply Checking GAS ConnectionsRed Surface Removing/Replacing Glass Door Pressure Testing Fireplace Gas ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Removing Louver PanelsInstalling Optional Brick liner Model BL32D Cleaning Glass DoorRemoving Glass Door Left Side Brick Panel Installing logs, lava rock and glowing embersOptional Remote control Installation model WRC Wall Switch InstallationFor Your Safety Read Before Lighting Wiring DiagramOperating Fireplace Lighting InstructionsOperating optional blower accessory To Turn OFF GAS To ApplianceOptional Remote Operation Pilot Assembly Cleaning MaintenanceInspecting Burners Burner Flame PatternPilot and burners LogsVenting system Observed Problem Possible Cause Remedy TroubleshootingChecking Gas Connections Gas leak. See WarningService Hints Replacement PartsTechnical Service SpecificationsRemote Control KIT WRC AccessoriesIllustrated Parts Breakdown 14123 21171 24353 24460 1141822-1 22-2109 Electronic Valve Propane/LP 116647-01B 116647-01B Warranty Information Keep this WarrantyLimited Warranty DIRECT-VENT Fireplace