Chapter 2 Provisioning
Configuration and Provisioning Solution Components
Figure 2-7 PGW 2200 and MGC Node Manager Details
End user Xterminal
Catalyst
MGC Node Manager | MGC Node Manager |
Presentation Server | Management Server |
Cisco
PGW 2200
Host/ |
| Active Host | Standby Host | ||||||||
SLT |
| ||||||||||
|
|
|
|
|
|
|
|
|
|
| |
detail |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Checkpointing |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Signaling Control network | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SLT |
|
| SLT |
|
|
| To Gateways and other | ||||
|
|
| SS7 A or F links |
|
|
| Cisco PGW 2200 nodes |
Link | Link | |
set A | ||
set B | ||
|
84413
CMNM Features
The most common Cisco EMF installation includes
CMNM uses Cisco EMF to manage the following components of the Cisco MGC node:
•Cisco MGC
•Cisco SLT
•LAN switch (Cisco Catalyst 2900, 5500 and 6509).
Cisco Internet OSS for VoIP: Infrastructure Manager Implementation Guide
|
| ||
|
|