Teledyne OT-2 operating instructions Piping Layout

Page 17

Model OT-2 System

 

 

Operational Theory 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2-5 Piping Layout

Figure 2-5 is the Piping Layout of the sampling system. In the standard instrument, calibration gases (zero and span) are con- nected directly to the Span Gas In port by teeing to the port with appropriate valves. The sample gas is connected to the Sample Gas In port in the same manner as the Span Gas.

Teledyne Analytical Instruments

2-9

Image 17
Contents Model OT-2 Oxygen Transmitter System Copyright 1999 Teledyne Analytical Instruments Model OT-2 SystemTable of Contents Ground Model OT-2 System Introduction Introduction Model OT-2 System Front View Introduction Model OT-2 System Introduction Model OT-2 System Operational TheoryMicro-Fuel Cell Sensor Principles of Operation Operational Theory Model OT-2 SystemCross Section of a Micro-Fuel Cell not to scale Electrochemical Reactions Model OT-2 System Operational Theory Characteristic Input/Output Curve for a Micro-Fuel Cell Electronics and Signal Processing Sample Flow Description See Figure Piping Layout Operational Theory Model OT-2 System Model OT-2 System Operation InstallationMounting Details Operation Model OT-2 SystemGas Connections Operation Model OT-2 System Front View of Transmitter Calibration Operation Model OT-2 System Installing the Micro-Fuel CellSample System Component Locations Span Gas % F.S. x 4 + = Output in VDC 100 3 H2S Scrubber Testing the SystemOperation Model OT-2 System Model OT-2 System Maintenance Model OT-2 System Scrubber Replacement Maintenance Model OT-2 System Appendix Qty Part Number Description Section I Product Identification Section III Physical Hazards Section V Emergency and First Aid Procedures Appendix