Omega DP26-RTD manual Disassembly, Disconnect the power supply before proceeding

Page 19

2.7 DISASSEMBLY

You may need to open up the meter for one of the following reasons:

To check or change the 115 or 230 Vac power jumpers.

To install or remove jumpers on the main board.

Disconnect the power supply before proceeding.

To remove and access the main board, follow these steps:

Disconnect the main power from the meter.

Remove the back case cover.

Lift the back of the main board upwards and let it slide out of the case.

11

Image 19
Contents User’s Guide Servicing North America Preface Standard ProceduresPage Iii Table of Contents Selecting Output Configuration OT.CF List of Figures Unpacking IntroductionEMC Considerations Safety ConsiderationsAbout the Meter Standard FeaturesDescription Add-On Options Available AccessoriesShows the location of each part of the front of the meter Front of the MeterSetpts Button Meter ButtonsReset Button Jumper Lockout Front Panel Lockout Push Button LockoutBack of the Meter Connector label ac Powered and dc Powered detailBack of the Meter Connector Description Disconnect the power supply before proceeding DisassemblyGetting Started Main Board Power JumpersRATING/PRODUCT Label Main Board Jumper Positions S3 Jumper Functions Plcs Mounting the MeterThrough 3-7 illustrate how to connect you power sensors Connecting Sensor InputMain Power Connections ac powered unit Connecting Main PowerAnalog and Relay Output Connections Main Power Connections dc powered unit11 Analog Output Connections Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Menu /DEV Reset DescriptionDisplay /DEV Setpoint Setpoint Configuration DisplaysSignal Input SpecificationsInput Power Information Analog Output if applicable Side View TOP View Menu Item Factory Preset Values Factory Preset ValuesCE Approvals Information WARRANTY/DISCLAIMER OMEGA…Of Course