Pressurizing and starting up the unit:

After all pipes have been connected, pressurise the system gradually and check for leaks.

Turn the “Osmosis pump” switch to “I”. Check that the following message displays:

In normal operation the value Rj varies during osmosis-treated water production.

Wait 5-10 minutes, then continue by starting up the delivery pump.

Osmosis pump switch

I M P O R T A N T !!!

Delivery pump startup (first startup)

Remove the red bleeder cap P (“Sfiato innesco”) on the front (close to the pressure gauge, labelled as such) .

To remove the cap, press the John Guest clip and allow a bit of water to run into a container; refit the cap P, and actuate the “Delivery pump” switch.

FAILURE TO FOLLOW THIS PROCEDURE TO

THE LETTER CAN CAUSE SERIOUS

DAMAGE TO THE DELIVERY PUMP.

Delivery pump switch Cap “P”

- 35 -

Image 9
Contents WO-01 Page Contents General warnings Technical characteristics 150-600 KPa Bar Positioning Electrical hookupPlumbing hookup Page Delivery pump startup first startup Pressurizing and starting up the unitReplacing the membranes Replacing the pre-filterInactivity Special adjustmentsPlumbing diagram FIL Wiring diagram Hook UP J2 Green Power LED RES List of faults Osmosis-treated water not produced Water production not conforming Page Electronic circuit board and programming Page