Smeg WO-01 manual Positioning, Electrical hookup, Plumbing hookup

Page 7

3. Positioning and installation

THE APPLIANCE MUST BE CONSIDERED AND HANDLED AS FRAGILE MATERIAL.

THE CIRCUIT DOWNSTREAM OF THE UNIT MUST BE CONSTRUCTED IN PLASTIC AND STAINLESS STEEL TO PREVENT CORROSION.

IF THE WATER SUPPLY CONTAINS PARTICLES IN SUSPENSION, AN EXTERNAL FILTER MUST BE INSTALLED TO PROVIDE SUFFICIENT DOWNSTREAM FLOW AND PRESSURE ; THIS FILTER MUST BE KEPT IN PERFECT CONDITION AT ALL TIMES .

Positioning:

Before installing the appliance, check that there is sufficient clearance for easy extraction of consumables and for servicing the unit. Check that there is a power socket in the vicinity of the unit. The appliance is designed for installation in clean area, protected from freezing temperatures.

Before installation, check:

-that there is sufficient space for the plumbing

-that there is good access for equipment, inspections and maintenance

Electrical hookup:

Make sure the power supply is adequate to the unit’s draw.

Caution: the power voltage rating is given on the unit’s dataplate.

WARNING: Do not open the unit’s electrical panel ; only qualified persons may do this.

Plumbing hookup:

Hook the machine up as indicated on the unit itself, “IN” indicates the water supply inlet, “OUT” indicates the osmosi-treated water outlet, RJ indicates the discharge outlet. Remove the red cap “T” from the RJ fitting and insert the water drain pipe supplied with the unit.

Apply the supplied pipe to the OUT fitting and equip its free end with a corrosion-proof cock if it is not hooked up directly to the service.

The water supply pressure may not exceed 6 bar nor be less than 1.5 bar.

WHEN FIRST RUNNING THE UNIT AND AFTER ANY SERVICE, RUN THE WATER DELIVERY TO A DRAIN FOR AT LEAST 20 MINUTES SO AS TO ELIMINATE ANY IMPURITIES RESULTING FROM THE WORK JUST DONE

All quick fittings are of the type

- 33 -

Image 7
Contents WO-01 Page Contents General warnings Technical characteristics 150-600 KPa Bar Electrical hookup PositioningPlumbing hookup Page Delivery pump startup first startup Pressurizing and starting up the unitReplacing the membranes Replacing the pre-filterInactivity Special adjustmentsPlumbing diagram FIL Wiring diagram Hook UP J2 Green Power LED RES List of faults Osmosis-treated water not produced Water production not conforming Page Electronic circuit board and programming Page