LG Electronics LGxxxA1C-B3 manual Registering a Replacement AC Module to the Gateway

Page 20

3-1-11 Registering a Replacement AC Module to the Gateway

If you need toexchange an AC module, follow the steps below.

1Enter LGElectronics (initial password) on the blank box in the figure and press the EnerBox Group chage button to return the gateway to the initial condition.

Check that the PLC LED has turned red.

2Press Back button. Wait for a minute and check that PLC LED is now turned to green. Then. press MAC Address List and check if the additional AC modules have been listed.

If you can’t see the additional AC modules, connect the gateway to another outlet near the distribution panel and search for the unlisted AC modules.

3Press Delete button to delete the exchanging AC module MAC address.

4Press Registration button to finish.

LGElectronics

3-1-12 Relocating a Gateway with Completed AC Module Registration

After the EnerBox is connected to a 120VAC outlet of the new location, enter into AC Module Status and check that all previously registered MAC addresses colors are shown in black.

MAC address color is red : Unreliable link detection.

If some MAC addresses colors are red, the EnerBox must be connected to a different AC outlet.

20

Image 20
Contents Troubleshooting Guide Product Specifications AC moduleDimension Dedicated Cables Response to Abnormal ConditionsParameter Range Clearing Time s Table of Contents Safety Safety SymbolsGateway Messages and Alerts Ex App Messages ScreenDate AC module ID Message type Ex Web Array View ScreenApp Message Screen Ex Web Event ScreenEx Voltage Low Screen X12 An array of AC modules Ex AC Frequency Low Ex Frequency Changing Too Fast ScreenNominal Frequency 60Hz 59.3 to 60.5Hz Hawaii 57 to 60.5Hz Error #1 DC Voltage High Error #2 DC Current HighEx DC Voltage High Screen Ex DC Current High ScreenError #3 AC Current High Error #4 Inverter FailureEx AC Current High Screen Ex Inverter Failure ScreenError #5 Temperature Protection Ex Temperature Protection ScreenAlert Gfdi Ex Gfdi ScreenGateway and Communication Issues Factors that Affect Power Line CommunicationProblems Checking AC Module through the Smartphone App Checking for Interferences to the Power Line Communication Connecting the Gateway to a Remote Router Solving Connection Issues in the GatewayRegistering Additional AC Modules to the Gateway Changing the EnerBoxRegistering a Replacement AC Module to the Gateway Relocating a Gateway with Completed AC Module RegistrationNetwork Configuration Troubleshooting Memo Memo
Related manuals
Manual 36 pages 62.6 Kb