UVPS 81-0112-01 Rev C manual MAINTENANCE, Care and Cleaning of the Crosslinker

Page 9

UV CROSSLINKERS

UVP

6.MAINTENANCE, CARE AND CLEANING OF THE CROSSLINKER

The UVP UV Crosslinker is built to provide you with trouble-free operation. To ensure correct service:

NOTE: ALWAYS UNPLUG UNIT FROM ELECTRICAL SUPPLY BEFORE CLEANING OR DRYING.

1.Wipe ANY water from inside and outside the unit with a soft cloth or sponge.

2.Use soap and water with a soft cloth or sponge to clean the unit.

3.Do not allow chemicals to remain on unit surfaces.

4.Never clean unit with abrasive pads or cleaners.

5.Never clean unit with acetone or chloroform.

6.Clean the UV sensor regularly with a soft cloth and alcohol.

UVP offers technical support for all of its products. If you have any questions about product use, operation or repair, please contact UVP Customer Service at the following numbers:

Corporate Headquarters: UVP, Inc.

2066 W. 11th Street,

Upland, CA 91786

TOLL FREE USA (800) 452-6788 PHONE: (909) 946-3197

FAX: (909) 946-3597

E-MAIL: info@uvp.com

European Operations:

Ultra-Violet Products Ltd.

Unit 1, Trinity Hall Estate

Nuffield Road

Cambridge CB4 1TG United Kingdom

PHONE: +44(0)1223 420022

FAX: +44(0)1223 420561

E-MAIL: uvp@uvp.co.uk

NOTE: A Returned Goods Authorization (RGA) number must be obtained before returning any item to UVP.

- 7 -

Image 9
Contents Ultraviolet Crosslinkers Contents Important Safety Information Description and SpecificationsIntroduction Electrical FeaturesCL-1000 Shortwave Crosslinker CL-1000L Longwave CrosslinkerOperation UV Crosslinkers UVP UV Crosslinkers UVP Applications MAINTENANCE, Care and Cleaning of the Crosslinker Changing the UV Wavelength UV Wavelength Calibration ProcedureUV Crosslinkers UVP Crosslinker Calibration Procedure Equipment necessary Voltage Range for U4 Range for U5 Operations with TOP Cover Removed Replacement Parts and Servicing ProceduresGeneral Servicing Procedures Replacement of tube holdersOperations With Top Cover Removed Removal of top cover Replacement of starter holder Replacement of startersReplacement of fuse holders Replacement of main connectorReplacement of main switch Replacement of UV sensor Replacement of PCBReplacement of membrane panel Replacement of reflector Changing plastic feet General Items Changing fusesSchematic Wiring Diagram Corporate Headquarters UVP, Inc