Braun RA500 service manual Figure D

Page 15

RAMP OPERATION

Ramp Manual Operation (continued)

To Reengage Carriage Assembly to Drive Chain:

1.

Position the ramp platform

4.

Grasp the platform Hand Hold

6.

Verify mechanism is reen-

 

manually so that only 15 cm

 

and move the platform slightly

 

gaged (locked). Pull on the

 

is extended out of the cas-

 

outward until platform locks

 

Hand Hold to ensure no

2.

sette.

 

into position (secured by re-

7.

movement occurs.

Turn (loosen) the manual

 

engaging the carriage assem-

Stow the remaining portion

3.

release “T” handle 90°.

5.

bly with the drive chain).

 

of the platform by using the

Push the “T” handle fully

Turn (tighten) the “T” handle

 

electrical system.

 

inward until handle contacts

 

90° to secure handle in the

 

 

 

shaft shoulder (3" to 4").

 

engaged (locked) position.

 

 

Figure D

TURN

TURN

 

 

TURN

 

 

TO

TO

 

LOCK

TO

LOCK

 

 

 

LOCK

Step 2

Step 3

Step 5

Figure E

Hand Hold

Page 13

Image 15
Contents Braun Congratulations Contents Ramp Terminology Illustration Ramp TerminologyRamp Components Terminology Illustration Figure BIntroduction Control Box Electronic Con Pan Weldment HousingChain Drive Assembly Ramp ComponentsRamp Operation Ramp Operation Operation Notes and Details Ramp Access Doors and InterlocksFamiliar with all ramp Operation safetyPrecautions, pre Read and becomeOne-Touch Operation In one Ramp Power OperationOperator Input Switches Halt Conditions Several condi Weight Sensing Pad optionalCommodate ramp Provide adequateClearance outside Vehicle to acBecome familiar with all ramp Secure the platform may Safety precautions Result in unintended rampRamp Manual Operation Provided. Failure to re-engageFigure D Ramp Passenger Safety Ramp Operation Installation / Service Safety Precautions Ramp InstallationRamp Installation Before performing Installation RequirementsInstallation, operation Read this manualFigure F 1005mm Floor Pocket Clear Opening DimensionsFigure H Clear Door Opening Width DimensionFigure J Installed Ramp StowedFigure K Figure L Figure M Figure N Installed Ramp Stowed RA500 w/o Fixed Sub floorFigure P Moving parts. Failure Route cables clearExhaust system Other hot areasProtected by Positive + batteryLead wire must be Installer-providedLubrication Diagram Maintenance and LubricationCycles Maintenance and Lubrication IntroductionYear or 1250 Cycles Establish a connection between the computer Electronic ControllerController only if ramp does not function ProperlyOperation Deploy MIN. Stow MAX Deploy Limit Stow Limit Adjust limits as followsLimit Adjustment Chart Systems DescriptionsPort Manual Calibration Instructions for ControllerAdjustment may Improper microswitchManual Release Signal Microswitch IN-Limit MicroswitchTroubleshooting Diagnosis Chart TroubleshootingDeploy Qty Description RA500-3236 Repair PartsExploded View Detail aRamp Wiring SchematicCond Wire Code Wiring DiagramPre-Trip Inspection Daily Preventive Maintenance ScheduleProviding Access to the World Braun Commercial RA500 Transit Ramp