Harmar Mobility CPL1400, CPL600, CPL1000 Installing the Outer Guard Panels, Installing Fixed Ramp

Page 7

7

Installing the Outer Guard Panels

Step 1

Remove the hexbolts on the corners of the platform. Insert the guard panel posts into the pockets in the platform. The smooth side of the guard panels should face in towards the center of the platform.

Step 3

Plug in the harness for the platform control box. Secure the harnesses under the clip on top of the carriage flange.

If you have a 90 degree exit platform, install the end guard panel using the provided bracket and bolt to inner guard panel.

Step 2

Install the platform control box on the rear guard panel using screws and nuts through the panel.

Installing Fixed Ramp

Step 1

Position the ramp after the lift is in its final location.

Maintain a gap of 3/8” to 3/4” between the ramp and platform.

Drill a pilot hole into the concrete and fasten using supplied concrete lags through ramp flanges.

Image 7
Contents G H L a N D E R Using the Manual Table of ContentsSpecifications When You Receive the LiftSafety Required materials Code RequirementsSite Requirements Required toolsController Harness Connections Preparing to Install the LiftStep Installing the PlatformInstalling Fixed Ramp Installing the Outer Guard PanelsInstalling Auto-folding Ramp optional Anchoring the Lift Setting the Limit Switches Verifying Operation of the Lift Call-Sends optional Manual OverrideTop Landing Gate optional Flush Strike Interlock EMI and Flush Strike Interlocks optionalEMI Interlock Platform Gate optional Fascia Panel optional Read the manual thoroughly before operating the lift Commercial Platform Lift Owners SectionSafety Keylock optional ControlsEmergency Stop DownOperating the Lift Down Purchased my Harmar lift because How did you hear about Harmar?Please rate your satisfaction with your Harmar dealer