Harmar Mobility CPL800, CPL600 manual Preparing to Install the Lift, Controller Harness Connections

Page 5

5

Preparing to Install the Lift

Final Site Inspection

Verify the surface the lift will mount to is smooth and level. This surface must be made from 3,500 psi reinforced concrete with a minimum thickness of 4”.

Verify that there is enough space for the lifts foot print. Be sure to include space neccesary for platform.

Caution: Verify that the running clearance around the lift complies with any codes for your area.

The horizontal gap between the edge of the platform and the upper landing must no less than 3/8” and no greater than 3/4”.

The horizontal gap between the guard panel and any wall or barrier must be no less than 2” and no greater than 3”.

Verify that sufficient head room exists above the lift. The lift will require 6’ 8” of clearance above the platform floor when the lift is at the upper landing.

Warning: The area between the floor where the lift is mounted and the top

landing must be covered by a smooth vertical fascia. This is to to eliminate any pinch points between the platform and landing.

Connecting to Electricity

The lift will require a 115 VAC 20 amp grounded electrical circuit.

Depending on local codes, this connection may need to be routed in electrical conduit and hard-wired.

Warning: Do not ride on the lift until it has been anchored in place.

Controller Harness Connections

High Voltage

Circuit Breaker

(AC unit only)

Platform

Traveling Cable

Safety Pan

Jumper

Upper Landing

Interlock

Upper & Lower Limit Switches

Low Voltage

Circuit Breaker

Phone Jack Connection

Lower Landing

Interlock

Upper & Lower

Call‐Sends

Bypass Switches

(Strikes only)

Image 5
Contents G H L a N D E R Using the Manual Table of ContentsSafety When You Receive the LiftSpecifications Site Requirements Code RequirementsRequired tools Required materialsController Harness Connections Preparing to Install the LiftStep Installing the PlatformInstalling Fixed Ramp Installing the Outer Guard PanelsInstalling Auto-folding Ramp optional Anchoring the Lift Setting the Limit Switches Verifying Operation of the Lift Call-Sends optional Manual OverrideTop Landing Gate optional EMI Interlock EMI and Flush Strike Interlocks optionalFlush Strike Interlock Platform Gate optional Fascia Panel optional Read the manual thoroughly before operating the lift Commercial Platform Lift Owners SectionSafety Emergency Stop ControlsDown Keylock optionalOperating the Lift Down Please rate your satisfaction with your Harmar dealer How did you hear about Harmar?Purchased my Harmar lift because