Code Requirements

Your lift has been designed to meet ASME A18.1 section 2 and CSA B44/ASME A17.5, with the addition of certain options. Code requirements for Vertical Platform lifts vary depending on location. It is the installers responsibility to contact their local code enforcement office and determine all of the regulations they are subject to. You must do this before installing the Vertical Platform Lift.

Site Requirements

The lift will require a 115vac 20amp grounded circuit.

Outdoor Installations will require a GFI protected circuit.

Only install the lift on a 4” thick , level 3,500 psi reinforced concrete slab.

Foot Print varies depending on platform size and options.

Required tools

1/2" Hammer Drill

3/8" Masonry Drill Bit

Appliance Dolly

Hammer

Level

Measuring Tape

Socket Wrench Set

Required materials

4 Floor anchors

Harmar recommends securing the lift using our Anchor Kit. If you purchase you own floor anchors they must use 3/8” bolts and have a minimum tensile strength of 6000 LBS.

Image 4
Contents G H L a N D E R Table of Contents Using the ManualSpecifications When You Receive the LiftSafety Code Requirements Site RequirementsRequired tools Required materialsPreparing to Install the Lift Controller Harness ConnectionsInstalling the Platform StepInstalling the Outer Guard Panels Installing Fixed RampInstalling Auto-folding Ramp optional Anchoring the Lift Setting the Limit Switches Verifying Operation of the Lift Manual Override Call-Sends optionalTop Landing Gate optional Flush Strike Interlock EMI and Flush Strike Interlocks optionalEMI Interlock Platform Gate optional Fascia Panel optional Commercial Platform Lift Owners Section Read the manual thoroughly before operating the liftSafety Controls Emergency StopDown Keylock optionalOperating the Lift Down Purchased my Harmar lift because How did you hear about Harmar?Please rate your satisfaction with your Harmar dealer