OPERATING INSTRUCTIONS

Battery Charging Instructions

Observe and Obey:

Do not use an external charger or booster battery.

Charge the battery in a well-ventilated area.

Use the proper AC input voltage for charging as indicated on the charger.

Use only a Genie authorized battery and charger.

Use the engine or the AC battery charger to recharge the batteries.

Charging the Batteries with the Engine

Running the engine will automatically charge the batteries.

All lift and drive functions can be operated while the engine is running.

Charging the batteries with the engine does not fully charge the batteries. Periodically, use the AC battery charger to fully charge the batteries.

Charging the Batteries with the AC Charger

1Be sure the engine (if equipped) is turned off.

2Be sure the batteries are connected before charging the batteries.

3Open the machine covers. The covers should remain open for the entire charging cycle.

4Remove the battery vent caps and check the battery acid level. If necessary, add only enough distilled water to cover the plates. Do not overfill prior to the charge cycle.

5Replace the battery vent caps.

6Connect the battery charger to a grounded AC circuit.

7Turn the battery charger on.

8The charger will automatically shut off when the charging cycle is complete.

9Check the battery acid level when the charging cycle is complete. Replenish with distilled water to the bottom of the fill tube. Do not overfill.

28

Genie TZ-50

Part No. 114164

Image 30
Contents Operator’s Manual Contents Contact usSafety Rules Do Not Operate UnlessElectrocution Hazards Tip-over HazardsMaximum allowable manual force CE and Australia 400 N Explosion and Fire Hazards Fall HazardsCollision Hazards Component Damage HazardsDamaged Machine Hazards Bodily Injury HazardTowing Hazards Optional Drive System Safety Tip-over Hazards Decal LegendTip-over Hazard Battery Safety Burn HazardsExplosion Hazards Lifting HazardControls Ground Control PanelStop Platform Control PanelStop Drive Control Panel OptionPre-operation Inspection FundamentalsPre-operation Inspection Observe and Obey MaintenanceMaintenance Symbols Legend Check the BatteriesCheck the Tires and Wheels Check the Hydraulic Oil LevelScheduled Maintenance Check the Engine Oil Level if equippedSetup for Function Tests Function TestsAt the Ground Controls Test Boom Functions and Function EnableTest the Parking Brake Test Emergency StopAt the Platform Controls Test Outrigger InterlockTest the Tilt Sensor Test Drive and Brake System if equipped Workplace Inspection Workplace InspectionOperating Instructions Emergency StopOnly use the machine as it was intended Operation from Platform Setup for OperationOperation from Ground Starting the Engine if equippedAustralian models only Manual Operation of FunctionsAll models except Australia Manual Operation of Jib Australian models onlyPlatform Overload Indicator Light if equipped Fall ProtectionOptional Drive System Operation Driving on a slope To determine the slope gradeMoving Machine Without a Tow Vehicle After Each UseStorage TowingTowing Information Battery Charging Instructions Observe and Obey Charging the Batteries with the EngineCharging the Batteries with the AC Charger Transport and Lifting Instructions Securing to Truck or Trailer for Transit Securing the ChassisLifting Instructions Center of Gravity TableAxis Chassis Lifting Points Decals Inspection for Decals with WordsGround Controls Side Platform EndInspection for Decals with Symbols Ground Controls Side Specifications Power sourceRange of Motion Chart Reporting Safety Defects Reporting Safety DefectsGenie Industries PO Box Redmond, WA Before Towing Before Driving