Installation Manual For Indoor Unit
(7) Installation work for air outlet ducts
Air conditioner main unit
Ceiling surface
BSpecial blowout (Option)
Heat | inlet duct |
|
|
insulation | (optional or |
| Suction panel |
| marketat item) |
| |
|
| (Silent panel) | |
A Blowout duct | C | special inlet (option) | |
(Optional or marketed item) | |||
|
|
| (with air filter) |
Hole for check
Calculate the draft and external static pressure and select the length, shape and blowout.
ABlowout duct
Note (1) Shield the central blowout hole for
(2) Shield the blowout hole around the center for
Limit the difference in length between spots at less than 2:1. Reduce the length of duct as much as possible.
Reduce the number of bends as much as possible. (Corner R should be as larger as possible.)
Bad example | Bad example | Good example |
Use a band. etc. to connect the main unit and the blowout duct flange.
Conduct the duct installation work before finishing the ceiling.
(8) Connection of suction, exhaust ducts
State seeing from top of unit |
| Exhaust hole | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Side fresh air inlet
Rear fresh air inlet
Fig.1 | Fig.2 |
(a) Duct connection position i) Fresh air inlet
Inlet can be selected from the side or rear faces depending on the working conditions. Use the rear fresh air inlet when the simultaneous intake and exhaust is conducted. (Side inlet cannot be used.)
ii)Exhaust (Make sure to use also the suction.) Use the side exhaust port.