Safety Precautions
The machine is adaptive in following situation
1. Applicable ambient temperature range:
For *EAA : |
| Rated Maximum Minimum | |||
Indoor | DB C | 27 | 32 | 18 | |
WB C | 19 | 23 | 14 | ||
Cooling | DB C | 35 | 43 | 10 | |
outdoor | |||||
| WB C | 24 | 26 | 6 | |
Heating Indoor | DB C | 20 | 27 | 15 | |
|
|
| |||
WB C | 14.5 | ||||
outdoor DB C | 7 | 24 | |||
6 | 18 | ||||
For *ERA : | WB C | ||||
|
|
|
| ||
|
| Rated Maximum Minimum | |||
Indoor | DB C | 27 | 32 | 18 | |
WB C | 19 | 23 | 14 | ||
Cooling | DB C | 35 | 43 | ||
outdoor | |||||
| WB C | 24 | 26 | ||
Heating Indoor | DB C | 20 | 27 | 15 | |
WB C | 14.5 | ||||
| |||||
outdoor DB C | 7 | 24 | |||
| WB C | 6 | 18 |
2.If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a similar qualified person.
3.If the fuse on PC board is broken please change it with the type of T 3.15A /250VAC.
4.The wiring method should be in line with the local wiring standard.
5.The power cable should be:
The connecting cable should be:
For series 182 ,
For the others, the connecting cable should be
All the cables shall have got the European authentication certificate. During installation, when the connecting cables break off, it must be assured that the grouding wire is the last one to be broken off.
6.The power cable and connect cable should be
7.The breaker of the air conditioner should be
8.The indoor unit installation height is at least 2.5m.
9.A leakage breaker must be installed.
5