Haier AD142AMBIA, AU142AFBIA installation manual 225, Preparation for suspending the unit

Page 18

INSTALLATION MANUAL FOR INDOOR UNIT

(4)Preparation for suspending the unit

(a)Figure of installation dimension: (unit: mm)

1024

452

100

55

225

123

 

225

 

 

 

22

Standard pressure 0 Pa , Middle pressure 50Pa

990

When install the duct hidden type indoor unit, the return air box must be designed and installed, as Figure3, Figure4.

The distance between the air outlet of duct and the air outlet of air conditioner should be no more than 1m.

The distance between the air outlet of duct and the air outlet of air conditioner should be no more than 1.0m(use white motor plug);

The distance between the air outlet of duct and the air outlet of air conditioner should be no more than 5.0m(use red motor plug).

Building roof of installation

(Figure 3)

1.0m (use white motor plug) 5.0m(use red motor plug)

Ceiling

A

Unit

Return air box

Air supply

Return air

Air outlet grille

Air supply

There should be no obstacles within 1m

(Figure 4)

Unit

Return air box

Return air

17

Image 18
Contents Operation & Installation Manual Table of Contents Disposal of the old air conditioner Safety Precautions Make sure the system is groundedDo not wash the air conditioner with water Applicable ambient temperature range Machine is adaptive in following situationParts and Functions Cooling or heating is not sufficient MalfunctionUnit fails to start Cooling is not sufficientFollowings are not malfunction Care and Maintenance CleaningPoints to observe When the room thermostat is actuated When heating is startedDefrosting operation in the heating mode Atmospheric temperature and warming capacityInstallation Manual for Outdoor Unit Installation placeInstallation where the area with strong winds InstallationOpen space requirement around the unit Piping size Precautions for refrigerant pipingOutline piping Piping connectionInstallation Manual for Outdoor Unit Installation Manual for Indoor Unit Avoid installation and use at those places listed below Preparation of indoor unit225 Preparation for suspending the unitInstall the hoisting screw Wood structureNew cement panel Suspending of indoor unit Original cement panelSteel structure RequirementsPermitted length and fall of connection pipe Material of connection pipe and thermal insulationConfirm drainage Connection of refrigerant pipeInstallation Manual for Electric Wiring Electric wiringWire. And the two ends of the shield Pay attention not to damage PC boardCheck and Test RUN Configuration of power supplyInstallation check and test run Set of the air sending of the fan motor