TROUBLESHOOTING & REPAIR

MAIN TRANSFORMER REMOVAL & REPLACEMENT (continued)

FIGURE F.25 – LIFT BAIL REMOVAL

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

REMOVAL OF LIFT BAIL

1.Remove the main input supply power to the machine.

2.With the 5/16” nut driver, remove the case top and sides.

3.Remove the two fiber baffles from the left and right sides of the lift bail adjacent to the main transformer. See Figure F.25.

4.Remove the two leads (#220 and #204) from resistor R2 (7.5 ohms, 100 watts).

5.Remove the positive capacitor strap from the output shunt.

6.Remove the negative capacitor strap from the negative rectifier plate.

7.Remove the sheet metal screw that holds the capacitor bank assembly to the case back. (This should enable the capacitor bank to be removed with the lift bail assem- bly.)

8.Using the 9/16” socket wrench, remove the four bolts (left and right) mounting the lift bail to the transformer top and bottom irons.

9.Using the 9/16” socket wrench, remove the four bolts, flat washers, and lock washers mounting the lift bail assembly to the base of the machine.

WARNING

The transformer and choke assembly is now loose and free to slide or “tip” on the base of the machine.

10.Remove the lift bail by lifting straight up and clear from the machine.

IDEALARC CV-400

Image 87
Contents Idealarc CV-400 California Proposition 65 Warnings SafetyElectric Shock can kill Cylinder may explode if damaged Sûreté Pour Soudage a L’Arc Précautions DE SûretéMaster Table of Contents for ALL Sections Table of Contents Installation Section Technical Specifications Idealarc CV-400 InstallationSafety Precautions Location and VentilationLifting Input Supply Connections Ground ConnectionReturn to Input Wire and Fuse SizeConnect Electrode and Work Leads to Output Terminals Reconnect Procedure Output ConnectionsFigure A.5 Output Terminal Connections Connect Wire Feeders Table of Contents Operation Section Safety Instructions OperationOperating Instructions Recommended Processes Operational Features and ControlsDesign Features General DescriptionLimitations Welding CapabilityFigure B.1 Case Front Controls Controls and SettingsRemote Control Welding OperationLocal Control Overload Protection Auxiliary PowerIdealarc CV-400 Table of Contents Accessories OPTIONS/ACCESSORIES Factory Installed OptionsField Installed Options Connecting the NA-3 to the Idealarc CV-400 Automatic Wire FeedersFeederterminal Connecting the NA-5 to the Idealarc CV-400Accessories Connecting the LN-7 to the Idealarc CV-400 Terminal Strip Semiautomatic Wire FeedersConnecting the LN-8 or LN-9 to the Idealarc CV-400 Idealarc CV-400 Table of Contents Maintenance Return to Return to Section TOC Safety Precautions Routine and Periodic MaintenanceFigure D.1 Idealarc CV-400 Table of Contents Theory of Operation Section Input Line VOLTAGE, Contactor and Main Transformer Theory of OperationOutput CONTROL, Rectification and Feedback Figure E.4 CV-400 Trigger and Thermal Light Circuit Protective Devices CircuitsFigure E.5 SCR Operation SCR OperationIdealarc CV-400 Table of Contents Troubleshooting & Repair Section HOW to USE Troubleshooting Guide Troubleshooting & RepairElectric Shock can kill PC Board Troubleshooting ProceduresOutput Problems Troubleshooting GuideOutput Problems SCR/Diode Perform the SCR/Diode Bridge SCR/Diode Rectifier Bridge Test Welding Problems Control Transformer T2 Voltage Test DescriptionMaterials Needed Control Transformer T2 Voltage Test Test ProcedureRight Side View Input Contactor Test Input Contactor Test Figure F.4 Input Contactor Test Connections Test for Contact ContinuityMain Transformer T1 Voltage Test Main Transformer T1 Voltage Test Figure F.6 Main Secondary Lead Test Points Blank Main Transformer T1 Voltage Test Static SCR/DIODE Rectifier Bridge Test Static SCR/DIODE Rectifier Bridge Test SCR Anode Remove ANY Insulating Paint Cathode SCR Active SCR Test Active SCR Test Figure F.15 Heat Sink Test Points Figure F.16 SCR Tester Circuit and SCR Connections Normal Open Circuit Voltage Waveform Maximum Output Setting no LoadTypical Output Voltage Waveform Machine Loaded Typical SCR Gate Voltage Waveform Maximum Output Setting no LoadONE Output SCR not Functioning Abnormal Output Voltage Waveform Machine LoadedDescription Input Contactor CR1 CLEANING/REPLACEMENTContactor Replacement Procedure Cleaning ProcedureFAN Motor and Blade Removal and Replacement Procedure FAN Motor and Blade Removal and ReplacementSCR/DIODE Rectifier Assembly Removal and Replacement Removal and Replacement SCR/DIODE Rectifier AssemblySCR Removal and Replacement SCR Removal and Replacement Figure F.21 1/2 Wide Leaf Spring Procedure for the 1/2 Inch Wide SpringClamping Procedure For 1/4-20 CAP Screws Clamping Procedure For 1/4-28 CAP ScrewsInch Wide Spring Procedure forAfter Replacing the SCRs Mounting of Stud Type Diodes To Aluminum Heat Sinks To Aluminum Heat Sinks Mounting of Stud Type DiodesMain Transformer Removal and Replacement Removal of Lift Bail Main Transformer Removal & ReplacementFigure F.26 Choke Removal Removal of Choke and TOP Iron AssemblyFigure F.27 Epoxy MIX Application Areas Reassembly of Transformer CoilsFigure F.28 Coil Lead Placement Figure F.30 Primary Thermostat Location Reassemble the Lift Bail Reassembling the Main Transformer Into the MachineWelding Output Load Test Retest After RepairInput Idle Amps and Watts Open Circuit VoltagesIdealarc CV-400 Section G Electrical DiagramsWiring Diagram Codes 10084, 10085 Wiring Diagram Code Control PC Board G2629-1 Layout Control PC Board G2629-1 Schematic Snubber Snubber PC Board M15370-3 Schematic Idealarc CV-400