Lincoln Electric SVM136-A service manual Procedure for the 1/2 Inch Wide Spring

Page 80

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

F-40

F-40

TROUBLESHOOTING & REPAIR

SCR REMOVAL AND REPLACEMENT (continued)

FIGURE F.21 – 1/2” WIDE LEAF SPRING

 

 

FIGURE F.22 – CLAMP ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10. Go to the procedure below that matches your machine’s cap screws. NOTE WHICH THREAD IS ON YOUR CAP SCREWS BEFORE PROCEEDING TO THE ASSEMBLY PROCEDURE. Two different designs of leaf springs and housings have been used to clamp the SCR to the rectifier. The two different designs can be identified by the size of the leaf spring. One design uses a 1/2 inch wide leaf spring, and the other uses a 5/8 inch wide spring. The different designs require different assembly and clamping procedures. The assem- bly procedure will be different depending upon the thread on the cap screws. A 1/4-28 thread requires a different tightening procedure than a 1/4-20 thread.

PROCEDURE FOR THE 1/2 INCH WIDE

SPRING

1.Place a piece of sleeving around each cap screw.

2.Insert cap screws through the leaf spring. Orient the leaf spring so that its ends are curved upward toward the cap screw heads. See Figure F.21. Pressing on the cap screw heads should produce a “rocking” motion of the spring in its housing. If the spring does NOT rock, it is installed upside down. Remove the spring and turn it over. Check for “rocking” motion. See Figure F.21.

3.Insert cap screws and leaf spring into the plastic housing.

4.Insert clamp assembly through heat sinks. Install nuts. Tighten clamp nuts equally on cap screws until finger tight. (See Figure F.22. Heat sinks may not be exactly as pictured.)

5.Reinspect the SCR for proper seating.

IDEALARC CV-400

Image 80
Contents Idealarc CV-400 Safety California Proposition 65 WarningsElectric Shock can kill Cylinder may explode if damaged Précautions DE Sûreté Sûreté Pour Soudage a L’ArcMaster Table of Contents for ALL Sections Table of Contents Installation Section Installation Technical Specifications Idealarc CV-400Lifting Safety PrecautionsLocation and Ventilation Ground Connection Input Supply ConnectionsInput Wire and Fuse Size Return toReconnect Procedure Output Connections Connect Electrode and Work Leads to Output TerminalsFigure A.5 Output Terminal Connections Connect Wire Feeders Table of Contents Operation Section Operating Instructions Safety InstructionsOperation Operational Features and Controls Design FeaturesGeneral Description Recommended ProcessesWelding Capability LimitationsControls and Settings Figure B.1 Case Front ControlsLocal Control Remote ControlWelding Operation Auxiliary Power Overload ProtectionIdealarc CV-400 Table of Contents Accessories Field Installed Options OPTIONS/ACCESSORIESFactory Installed Options Automatic Wire Feeders Connecting the NA-3 to the Idealarc CV-400Connecting the NA-5 to the Idealarc CV-400 FeederterminalAccessories Semiautomatic Wire Feeders Connecting the LN-7 to the Idealarc CV-400 Terminal StripConnecting the LN-8 or LN-9 to the Idealarc CV-400 Idealarc CV-400 Table of Contents Maintenance Safety Precautions Routine and Periodic Maintenance Return to Return to Section TOCFigure D.1 Idealarc CV-400 Table of Contents Theory of Operation Section Theory of Operation Input Line VOLTAGE, Contactor and Main TransformerOutput CONTROL, Rectification and Feedback Protective Devices Circuits Figure E.4 CV-400 Trigger and Thermal Light CircuitSCR Operation Figure E.5 SCR OperationIdealarc CV-400 Table of Contents Troubleshooting & Repair Section Troubleshooting & Repair HOW to USE Troubleshooting GuidePC Board Troubleshooting Procedures Electric Shock can killTroubleshooting Guide Output ProblemsOutput Problems SCR/Diode Perform the SCR/Diode Bridge SCR/Diode Rectifier Bridge Test Welding Problems Materials Needed Control Transformer T2 Voltage TestDescription Test Procedure Control Transformer T2 Voltage TestRight Side View Input Contactor Test Input Contactor Test Test for Contact Continuity Figure F.4 Input Contactor Test ConnectionsMain Transformer T1 Voltage Test Main Transformer T1 Voltage Test Figure F.6 Main Secondary Lead Test Points Blank Main Transformer T1 Voltage Test Static SCR/DIODE Rectifier Bridge Test Static SCR/DIODE Rectifier Bridge Test SCR Anode Remove ANY Insulating Paint Cathode SCR Active SCR Test Active SCR Test Figure F.15 Heat Sink Test Points Figure F.16 SCR Tester Circuit and SCR Connections Maximum Output Setting no Load Normal Open Circuit Voltage WaveformTypical Output Voltage Waveform Machine Loaded Maximum Output Setting no Load Typical SCR Gate Voltage WaveformAbnormal Output Voltage Waveform Machine Loaded ONE Output SCR not FunctioningInput Contactor CR1 CLEANING/REPLACEMENT DescriptionCleaning Procedure Contactor Replacement ProcedureFAN Motor and Blade Removal and Replacement FAN Motor and Blade Removal and Replacement ProcedureSCR/DIODE Rectifier Assembly Removal and Replacement SCR/DIODE Rectifier Assembly Removal and ReplacementSCR Removal and Replacement SCR Removal and Replacement Procedure for the 1/2 Inch Wide Spring Figure F.21 1/2 Wide Leaf SpringClamping Procedure For 1/4-28 CAP Screws Clamping Procedure For 1/4-20 CAP ScrewsProcedure for Inch Wide SpringAfter Replacing the SCRs Mounting of Stud Type Diodes To Aluminum Heat Sinks Mounting of Stud Type Diodes To Aluminum Heat SinksMain Transformer Removal and Replacement Main Transformer Removal & Replacement Removal of Lift BailRemoval of Choke and TOP Iron Assembly Figure F.26 Choke RemovalReassembly of Transformer Coils Figure F.27 Epoxy MIX Application AreasFigure F.28 Coil Lead Placement Figure F.30 Primary Thermostat Location Reassembling the Main Transformer Into the Machine Reassemble the Lift BailRetest After Repair Input Idle Amps and WattsOpen Circuit Voltages Welding Output Load TestIdealarc CV-400 Electrical Diagrams Section GWiring Diagram Codes 10084, 10085 Wiring Diagram Code Control PC Board G2629-1 Layout Control PC Board G2629-1 Schematic Snubber Snubber PC Board M15370-3 Schematic Idealarc CV-400