Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
TROUBLESHOOTING & REPAIR
MAIN TRANSFORMER (T1) VOLTAGE TEST (continued)
FIGURE F.5 – INPUT CONTACTOR, RECONNECT PANEL, AND PRIMARY LEADS
TO MAIN TRANSFORMER LOCATIONS
Return to Section TOC
Return to Master TOC
TEST PROCEDURE
1.Set the ON/OFF power switch to OFF.
2.Disconnect main input supply power from the machine.
3.With the 5/16” nut driver, remove the case top and sides and the reconnect panel cover.
4.Inspect the input contactor, reconnect panel, and primary leads to the main trans- former for loose or faulty connections. See Figure F.5.
a.Confirm that the reconnect panel is connected properly for the
5.Connect main input supply power to the machine.
6.Set the ON/OFF power switch to ON.
a.Make sure the input contactor (CR1) energizes and the fan runs.
7.Test with an AC voltmeter for proper main input supply voltage to the line side of the input contactor (CR1). See the Wiring Diagram.
a.L1 to L2.
b.L2 to L3.
c.L1 to L3.
Return to Section TOC
Return to Master TOC