Black Box BRTS-100 manual Test Procedures

Models: BRTS-100

1 45
Download 45 pages 37.79 Kb
Page 26
Image 26

CHAPTER 4: Test Procedures

10.Put the Test Set in the CONTINUITY Test Mode.

11.a. If the Green Test Status light goes on, there is a physical connection between the terminal and the NT1.

b.If the Red Test Status light goes on, there is no continuity on the receive pair between the terminal and the NT1. You should check the loop for opens. There’s no need for any further testing.

12.The problem may be that the signal received at the NT1 is too low.

To check this, put the Test Set back in the NORMAL mode by pushing the LINE button.

13.Put the Test Set in the LEVEL test mode.

14.a. If the Green Test Status light goes on, the terminal is receiving the proper level. The problem may be that either the switch or the NT1 isn’t working.

b.If the Red Test Status light goes on, the signal level at the terminal is too low. Check the loop length.

25

Page 26
Image 26
Black Box BRTS-100 manual Test Procedures