BRTS-100 ISDN TEST SET
4. Test Procedures
4.1 Overview
This chapter gives you several suggested test procedures. However, it is by no means the only way to use the Test Set to isolate trouble or to verify lines.
NOTE: The following procedures assume certain conditions exist (that procedures are followed in the correct order.) These conditions are described at the beginning of each procedure.
TEST CONFIGURATIONS
Test Configuration 1 — Point-to-Point — NT1 (Figure 4-1)
To put the circuit in the
1. Disconnect the terminal.
NOTE: With a passive bus, testing the S/T interface may disrupt the operation of other devices on the bus.
2.Connect the jack to either Port A or Port B of the Test Set.
3.The Test Set should be terminated; the TERMINATE button should be out.
| NT1 | |
| ||
|
|
|
|
|
|
POINT TO POINT — NT1
Figure 4-1. Test Configuration 1.
14