Black Box BRTS-100 manual Comprehensive troubleshooting flow chart 2

Models: BRTS-100

1 45
Download 45 pages 37.79 Kb
Page 19
Image 19

BRTS-100 ISDN TEST SET

13.a. If the terminal works, there’s no need to proceed any further.

b.If the terminal does not work, proceed to step 14.

14.Perform the PAIR REVERSAL test procedure (see page 22).

15.Put the circuit into its normal operating configuration. (Connect all terminals to the S/T interface.)

16.a. If the terminal works, there’s no need to proceed any further.

b.If the terminal does not work, proceed to step 17.

17.At this point, you’ve determined that there’s nothing wrong physically with the S/T interface. The problem is either within the terminal or NT1—or possibly the ISDN network. Perform the MONITOR test procedure (see page 26).

A

USING PASSIVE

NO

MONITOR

BUS?

 

 

YES

PB1 - CHECK

DONE

TERMINATIONS

 

TERMINAL

NO

PB2 - PAIR

TERMINAL

WORK?

 

REVERSAL

WORK?

NO

YES

YES

GOOD LINE,

GOOD LINE,

DONE

DONE

Figure 4-4. Comprehensive troubleshooting flow chart (2 of 2).

18

Page 19
Image 19
Black Box BRTS-100 manual Comprehensive troubleshooting flow chart 2