CHAPTER 4: Test Procedures
NT1
TERMINAL
UNDER
Figure 4-2. Test Configuration 2.
Test Configuration 2 — Passive Bus (Figure 4-2)
To put the terminal in the Passive Bus Test Configuration:
1. Disconnect the terminal.
NOTE: With a passive bus, the S/T interface may disrupt the operation of the other devices on the bus.
2.Connect the S/T jack to Port B of the Test Set.
3.Connect the terminal to Port A of the Test Set.
4.The Test Set should be
Test Configuration 3 —
1.Disconnect the terminal.
2.Connect the terminal to the Test Set’s A or B port.
3.Put the Test Set in REVerse mode, LINE button in.
4.The Test Set should be terminated; the TERMINATE button should be out.
TERMINAL |
POINT TO POINT — TERMINAL
Figure 4-3. Test Configuration 3.
15