Black Box BRTS-100 manual Pair reversal flow chart 2

Models: BRTS-100

1 45
Download 45 pages 37.79 Kb
Page 32
Image 32

CHAPTER 4: Test Procedures

 

 

 

 

 

 

A

NEED TO CHECK

 

 

 

 

 

 

 

 

 

 

GO TO NEXT

ALL PORTS ON

 

 

 

OUTLET ON BUS

THE BUS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PUT 2nd

 

 

 

 

 

 

 

 

 

 

 

 

BRTS-100 (B) ON

 

 

 

 

 

 

BUS, TERMINATED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINATE,

 

 

 

 

 

 

 

 

TRANSMIT,

 

 

 

 

 

 

 

 

INITIATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GRN

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

TEST STATUS?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRING THE SAME

 

 

 

 

WIRING DIFFERENT

 

ON PORT UNDER

 

 

 

 

ON PORT UNDER

 

TEST AND PORT

 

 

 

 

TEST AND PORT

 

BRTS-100 (A) IS ON

 

 

 

 

BRTS-100 (A) IS ON

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECK WIRING,

 

 

 

 

 

 

 

 

 

PINS 3 & 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNPLUG 2nd

NO

ALL PORTS

YES

ALL PAIR

 

 

 

REVERSALS

BRTS-100 (B)

 

CHECKED?

 

 

 

 

 

IDENTIFIED

 

 

 

 

 

Figure 4-9. Pair reversal flow chart (2 of 2).

31

Page 32
Image 32
Black Box BRTS-100 manual Pair reversal flow chart 2