Lincoln Electric SAE-300 manual

Page 34

• World's Leader in Welding and Cutting Products •

• Sales and Service through Subsidiaries and Distributors Worldwide •

Cleveland, Ohio 44117-1199 U.S.A. TEL: 216.481.8100 FAX: 216.486.1751 WEB SITE: www.lincolnelectric.com

Image 34
Contents SAE-300 Safety California Proposition 65 WarningsARC Rays can burn Electric ShOCK can killFuMES and Gases can be dangerous Cylinder may explode if damaged Welding and CuTTING Sparks can Cause fire or explosionIii PRÉCAuTIONS DE Sûreté Sûreté Pour Soudage a L’ArcPlease Examine Carton and Equipment For Damage Immediately On-Line Product RegistrationTAbLE of Contents Description InstallationTEChNICAL Specifications SAE-300 Volts @ Rated Amps CycleGeneral Description Design FEATuRESReceptacle Location / Ventilation PRE-OPERATION InstallationTrailer see Optional FEATuRES MAChINE GROuNDINGOIL PRE-OPERATION ServiceCooling System To prevent ExPLOSION when 5INSTALLATIONA-5BATTERY ChARGING To prevent Electrical Damage whenStarting ThE SAE-300 404D-22 Diesel Engine OperationENGINE OPERATION Cold WEAThER StartingEngine bREAK-IN Welder OperationStick / TIG Welding MIG Welding Idler OperationAccessories Optional FEATuRES Field InstalledWire Feeder Options General INSTRuCTIONS MaintenanceSafety PRECAuTIONS Cooling SystemPuRGING AIR from FuEL System Perkins 404D-22 Engine Idler MaintenanceNameplates Vent Screw Priming LeverMaintenance Gfci Testing and Resetting PROCEDuRETROubLEShOOTING HOW to uSE TROubLEShOOTING GuIDEPOSSIbLE CAuSE PRObLEMSSymptoms RecommendedPOSSIbLE Areas of MISADJuSTMENTSS Your local Lincoln AuthorizedElectronic Idler TROubLEShOOTING GuIDE Open ClosedAuxiliary Power Load is Turned on Defective -- Will Not CloseAuthorized Field Service Facility Contact your local LincolnWater passage. Flush the system Ing on Faulty light wiring Diagrams S10766-14 Atenção Atenção