OVERLAY TYPES

Four types of overlays can be used with the Power Wave.

1.Process Overlays. These overlays are used to create, save and recall specific welding proce- dures by selecting and adjusting the various weld- ing settings that have been programmed into the Power Wave at the factory.

2.Weld From Memory Overlays. These overlays (also called Shop Overlays) provide a simple way for operators to recall and use any of the welding procedures that have been stored in the memory of the Power Wave.

3.Setup Overlays. These overlays provide specific machine setup information, such as operating lim- its for the welding procedures stored in memory.

4.Special Purpose Overlays. These are custom overlays for specific customer applications.

Detailed information on how to use currently available Power Wave overlays follows.

Overlay

Overlay

Figure

Type

Name

No.

1

GMAW PULSE, GMAW

 

 

FCAW, STICK PROCESS

 

 

SELECTION OVERLAY

B.4

2

ROBOTIC INTERFACE,

 

 

WELD FROM MEMORY,

 

 

DUAL PROCEDURE OVERLAY

B.5

3

*LIMITS OVERLAY

B.6

3

SETUP OVERLAY

B.7

*This overlay is optional. See Accessories Section for Order Numbers.

POWER WAVE 450

Image 22
Contents Safety Depends on You For use with machines having Code NumbersSafety California Proposition 65 WarningsElectric Shock can kill Welding Sparks can cause fire or explosion IiiPrécautions DE Sûreté Sûreté Pour Soudage a L’ArcThank You Please Examine Carton and Equipment For Damage ImmediatelyTable of Contents Vii Section CViii Section DSection G Section ESection F SeriesPower Wave InstallationTechnical Specifications Power Wave AwgiecSelect Suitable Location Safety PrecautionsHigh Frequency Precautions Input ConnectionsInput Voltage Reconnect Procedure Input Power ConnectionsInput Fuse and Supply Wire Considerations Ground ConnectionsWork and Electrode Cable Connections Wire Feeder ConnectionsOutput Connections Water Cooler ConnectionsPower Wave 450 Robotic Dimensions Power Wave 450 Robotic Operation Safety InstructionsOperating Instructions Select your process information Save process information if desiredGeneral Description Controls and Settings Case Front ControlsOperating Overlays Installing AN OverlayOverview Overlay Overlay TypesName PULSE, GMAW, FCAW, and STICK/TIG Process Selection Overlay Overlay ID Number =Operation Then Robotic Interface Weld from MEMORY, Dual Procedure Overlay Select a Memory LocationOperation Recall from Memory KEY Memory Location Numbers Limits Overlay OptionalSET Limit KEY Limit UP / Down Keys Operation Setup Overlay Figure B.7 Setup OverlayPositive Polarity Voltage Sensing Wire Feeder Setup Description+/- Polarity KEY Table B.1 Positive Voltage Sensing OptionsPulse Procedures Overview of Welding ProceduresFlux Cored ARC Welding Fcaw and Gmaw Procedures Wave ControlGmaw Table B.3 Adjustble ParametersFcaw Thermal Protection Pulse WeldingOverload Protection Current ProtectionRobotic Interface Robot Signal DescriptionsInterface Description Wire Fault Touch Sense SignalGAS Fault Water FaultWire Stick Detect Power Wave CircuitsDual Procedure Switch COM- Mand Robot Controller Electrical CharacteristicsWater Fault Touch Sense Command ARC DetectGAS Fault Power Fault Dual Procedure Switch CommandWeld Equipment Setup Robot Controller SetupWeld System Setup Touch Sensing SetupArctool Welding Inputs and Outputs Power Wave Interface BoardConnections Miscellaneous ConnectionsRecommended Coolants AccessoriesWater Cooler Usage Priming the CoolerFor the Latest L9777 Wire Feed Unit Dimension PrintType Mounting the Wire Feed Unit Electrode Routing Connecting Wire Feed Unit to Power SourceAluminum Wire Sizes Procedure to Install Drive Roll and Guide TubesSteel Wire Sizes Roll Drive Roll and Guide Tube KitsIdle Roll Pressure Setting Feeding Electrode and Brake Adjustment Requires Installation of 2 51MM K162H Spindle KITTo Mount a 50-60lb 22.7-27.2kg Coil Wire Loading of 13-14lb 6kg Innershield CoilsFeeding Electrode Periodic Maintenance of Wire Drive Unit Wire Reel Mounting 50 22.7kg and 60lb 27.2kg CoilsAvoiding Wire Feeding Problems Wire Drive Motor and GearboxSwitch Requirements Connector for 1/16 5/64 1.6 2.0 mm WireRoutine and Periodic Maintenance MaintenanceInput Filter Capacitor DIS Charge Procedure Figure D.1 Resistor Locations Locate the #9 and #12 terminals, identified by Discharge labels, on each of the four SwitchConnected Preventive Maintenance G3503- Installation or SER Vice Tool Usage Removing and Installing the G3503 CoolerG3503- Cooler Periodic Maintenance G3503- Cooler ServiceFigure D.4 General Component Locations HOW to USE Troubleshooting Guide TroubleshootingED Tests Authorized Field Service Facility Troubleshooting GuideSists, contact your local Lincoln Play fans run Check circuit breaker 5-amp Observe Safety Guidelines Controls and Settings Power-up Inspect the overlay bar code Saved in memory are different Check for proper shielding gas Need Welding Training? How To Read Shop DrawingsNew Lessons in Arc Welding Basic CoursePrecaucion Aviso DE