Lincoln Electric 575 manual Lifting, High Altitude Operation, High Temperature Operation, Towing

Page 13

A-3

INSTALLATION

A-3

LIFTING

The Vantage lift bale should be used to lift the machine. The Vantage is shipped with the lift bale retracted. Before attempting to lift the Vantage the lift bale must be secured in a raised position. Secure the lift bale as follows:

a.Open the engine compartment door.

b.Locate the 2 access holes on the upper middle region of compartment wall just below the lift bale.

c.Use the lifting strap to raise the lift bale to the full upright position. This will align the mounting holes on the lift bale with the access holes.

d.Secure the lift bale with 2 thread forming screws. The screws are provided in the shipped loose parts bag.

WARNING

FALLING EQUIPMENT can cause injury.

• Do not lift this machine using lift bale if it is equipped with a heavy accessory such as a trailer or gas cylinder.

Lift only with equipment of adequate lifting capacity.

•` Be sure machine is stable when lifting.

-------------------------------------------------------------------------------------

HIGH ALTITUDE OPERATION

At higher altitudes, output derating may be necessary. For maximum rating, derate the welder output 4% for every 300 meters (984 ft.) above 1500 meters (4920 ft.). For output of 500A and below, derate the welder output 4% for every 300 meters (984 ft.) above 2100 meters (6888 ft.).

Contact a Cummins Service Representative for any engine adjustments that may be required.

HIGH TEMPERATURE OPERATION

At temperatures above 40°C (104°F), output voltage derating may be necessary. For maximum output current ratings, derate welder voltage rating 2 volts for every 10°C (21°F) above 40°C (104°F).

TOWING

The recommended trailer for use with this equipment for road, in- plant and yard towing by a vehicle (1) is Lincoln’s K953-1. If the user adapts a non-Lincoln trailer, he must assume responsibility that the method of attachment and usage does not result in a safety hazard nor damage the welding equipment. Some of the factors to be considered are as follows:

1.Design capacity of trailer vs. weight of Lincoln equipment and likely additional attachments.

2.Proper support of, and attachment to, the base of the welding equipment so that there will be no undue stress to the trailer’s framework.

3.Proper placement of the equipment on the trailer to insure stability side to side and front to back when being moved and when standing by itself.

4.Typical conditions of use, such as travel speed, roughness of surface on which the trailer will be operated, and environmental conditions.

5.Proper preventative maintenance of trailer.

6.Conformance with federal, state and local laws (1) .

(1)Consult applicable federal, state and local laws regarding specific requirements for use on public highways.

Vantage 575

Image 13
Contents Vantage Safety Electric Shock can kill For Electrically powered equipment Précautions DE Sûreté SafetyWELDING, EMF & Pacemakers Instructions for Electromagnetic Compatibility Thank You Table of Contents Accessories Section C Installation Safety Precautions InstallationLocation / Ventilation Lifting High Temperature OperationHigh Altitude Operation TowingPRE-OPERATION Engine Service Welding Terminals Auxiliary Power Receptacles Remote ControlStandby Power Connections OutputConnection of Lincoln Electric Wire Feeders Connection of Prince XL Spool GUN to the Vantage Connection of the LN-25 to the VantageOperation Safety InstructionsGeneral Description Recommended ApplicationsEngine Temperature Gauge RUN Stop SwitchStart Pushbutton Hour MeterIdler Switch Battery Charging LightOIL Pressure Gauge Engine ProtectionAuxiliary Power Controls Starting the Engine Engine OperationStopping the Engine BREAK-IN Period For Tungsten Electrodes OperationAuxiliary Power Operation Table B.4 Vantage Simultaneous Welding and Power Loads Optional Field Installed Accessories AccessoriesRoutine and Periodic Maintenance MaintenanceEngine Maintenance Fuel Filters Battery HandlingCooling System Welder / Generator Maintenance HOW to USE Troubleshooting Guide TroubleshootingTroubleshooting Troubleshooting Misadjustments Course of Action Problems Possible Areas RecommendedVantage 575 Wiring Diagram K2170-1 50HZ DiagramsDIAGRAMSF-2 Commander / K867 / K775 / LN-7 Connection Diagram Diagrams Diagrams Commander / K867 / LN-8 Connection Diagram Diagrams Diagrams Engine Welders /LN-8 Connection Diagram Diagrams Diagrams Diagrams Diagrams Dimension Print Vantage Vantage Aviso DE Precaucion