Exide PAR20 manual

Page 1

®

SECTION 92.80 2008-07

Installation and Operating

Instructions

For

ABSOLYTE® GX Batteries

®

Image 1
Contents Page Table of Contents System Arrangements 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1 List of Tables List of IllustrationsAppendices Appendix aGeneral Safety MessagesSulfuric Acid Burns Explosive GasesDelivery Information Installation ConsiderationsPage Table a Table B UnpackingSystem Arrangements System AssemblyUnpacking Modules Handling ModuleTip Over Procedure Beam Hardware Installation Beam Support InstalledTIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage Bottom Supports I-beamsHorizontal Stacking SHACKLE-STRAP Usage TIP-OVER Procedure Module After TIP-OVERElectrical Connections Installing Completed Hardware Horizontal StackPositioning Horizontal Base Modules TIE Plate Assemblies Horizontal StacksStack Connections Identification LabelsDescription QTY PER System Terminal Plate Kit Materials & AssemblyInitial Charge Protective Module CoversStep Table CDescription QTY PER System Module Clear Cover Materials and AssemblyTemperature Correction Battery OperationRecommended Float Range @77F Effects of Float Voltage Equalizing ChargeTable D Ohmic MeasurementsTable E RecordkeepingMaintenance Unit CleaningCapacity Testing TAP ConnectionsAbsolyte Battery Maintenance Report Type MANUF. Date Install Date System Voltage Battery Temperature C 104 105 106 107 108 109 110 111 112 113 100 103Appendix C Bonding & Grounding of Battery RackPage Exide Technologies Industry Leader