Exide PAR20 manual 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1

Page 4

SECTION 13: 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8

SECTION 14: 14.0 14.1 14.2

SECTION 15: 15.0 15.1 15.2

SECTION 16: 16.0

SECTION 17: 17.0

SECTION 18: 18.0

SECTION 19

19.0

SECTION 20 20.0

BATTERY OPERATION

19

Cycle Method of Operation

19

Floating Charge Method

19

Float Charge - Float Voltages

19

Recharge

19

Determining State-of-Charge

19

Effects of Float Voltage

20

Float Current and Thermal Management

20

AC Ripple

20

Ohmic Measurements

20

EQUALIZING CHARGE

20

General

20

Equalizing Frequency

21

Equalizing Charge Method

21

RECORDKEEPING

21

Pilot Cell

21

Voltmeter Calibration

21

Records

21

TAP CONNECTIONS

22

Tap Connections

22

TEMPORARY NON-USE

22

Temporary Non-Use

22

UNIT CLEANING

22

Unit Cleaning

22

CONNECTIONS MAINTENANCE

22

Connections

22

CAPACITY TESTING

22

Capacity Testing

22

Image 4
Contents Page Table of Contents System Arrangements 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1 List of Illustrations List of TablesAppendices Appendix aSafety Messages GeneralSulfuric Acid Burns Explosive GasesInstallation Considerations Delivery InformationPage Table a Unpacking Table BSystem Assembly System ArrangementsUnpacking Modules Handling ModuleBeam Hardware Installation Beam Support Installed Tip Over ProcedureTIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage Bottom Supports I-beamsTIP-OVER Procedure Module After TIP-OVER Horizontal Stacking SHACKLE-STRAP UsageInstalling Completed Hardware Horizontal Stack Electrical ConnectionsPositioning Horizontal Base Modules TIE Plate Assemblies Horizontal StacksIdentification Labels Stack ConnectionsTerminal Plate Kit Materials & Assembly Description QTY PER SystemProtective Module Covers Initial ChargeStep Table CModule Clear Cover Materials and Assembly Description QTY PER SystemTemperature Correction Battery OperationRecommended Float Range @77F Equalizing Charge Effects of Float VoltageTable D Ohmic MeasurementsRecordkeeping Table EUnit Cleaning MaintenanceCapacity Testing TAP ConnectionsAbsolyte Battery Maintenance Report Type MANUF. Date Install Date System Voltage Battery Temperature C 100 103 104 105 106 107 108 109 110 111 112 113Bonding & Grounding of Battery Rack Appendix CPage Exide Technologies Industry Leader