Exide PAR20 manual Appendix C, Bonding & Grounding of Battery Rack

Page 27

APPENDIX C

BONDING & GROUNDING OF BATTERY RACK

INTRODUCTION

1. To insure personnel safety, and equipment protection, operation, and reliability, the battery rack should be connected to the Common Bonding Network (CBN).

2. Electrical continuity between modules is provided through the use of serrated hardware. Testing has shown that standard sys- tems are compliant with the GR-1089-CORE, Issue 4, Section 9 requirements of the Bonding and Grounding tests.

GROUNDING KIT INSTALLATION (OPTIONAL)

1. Each kit consists of the following components:

(2) #6 AWG, 12 in. 90°C cables

(4) “C” shaped beam clamps

(4) 1/4-20 x 0.75 in. bolts

(4) 1/4-20 x 1.00 in. bolts

2. Using (1) 1/4-20 x 1.00 in. bolt per beam clamp, connect (1) beam clamp to the I-beam flange and (1) beam clamp to the back flange of the module (see Figure 1). Be sure to securely tighten the bolts such that the paint is penetrated (see Figure 2).

3. Attach each end of cable assembly to a beam clamp using (1) 1/4-20 x 0.75 in. bolt per end (see Figure 3). Tighten hardware securely. 4. Repeat Steps 2 and 3 for the second horizontal support (I-beam).

Figure 1: Beam Clamp Installation

Figure 2: Adequate Paint Penetration

Figure 3: Cable Assembly Installation

CONNECTING TO THE CBN

1. The recommended location for attaching the frame ground is the back “C” channel on the upper module of the stack (see Figure 4).

Figure 4: Recommended Frame

Ground Location

2. Once the location is determined, it will be necessary to drill (2) holes for the frame ground conductor/lug (installer supplied). Note, hole size and spacing will be dependent on the lug.

3. Using a grinder, etc., remove the paint from around the holes drilled in Step 2.

Apply a thin film of NO-OXID grease to the bare metal and attach the frame ground conductor/lug. 27

Image 27
Contents Page Table of Contents System Arrangements 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1 Appendix a List of IllustrationsList of Tables AppendicesExplosive Gases Safety MessagesGeneral Sulfuric Acid BurnsDelivery Information Installation ConsiderationsPage Table a Table B UnpackingHandling Module System AssemblySystem Arrangements Unpacking ModulesBottom Supports I-beams Beam Hardware Installation Beam Support InstalledTip Over Procedure TIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP UsageHorizontal Stacking SHACKLE-STRAP Usage TIP-OVER Procedure Module After TIP-OVERTIE Plate Assemblies Horizontal Stacks Installing Completed Hardware Horizontal StackElectrical Connections Positioning Horizontal Base ModulesStack Connections Identification LabelsDescription QTY PER System Terminal Plate Kit Materials & AssemblyTable C Protective Module CoversInitial Charge StepDescription QTY PER System Module Clear Cover Materials and AssemblyBattery Operation Temperature CorrectionRecommended Float Range @77F Ohmic Measurements Equalizing ChargeEffects of Float Voltage Table DTable E RecordkeepingTAP Connections Unit CleaningMaintenance Capacity TestingAbsolyte Battery Maintenance Report Type MANUF. Date Install Date System Voltage Battery Temperature C 104 105 106 107 108 109 110 111 112 113 100 103Appendix C Bonding & Grounding of Battery RackPage Exide Technologies Industry Leader