Exide PAR20 manual Exide Technologies Industry Leader

Page 29

Exide Technologies –

The Industry Leader.

GNB Industrial Power, a division of Exide Technologies, is a global leader in stored electrical energy solutions for all major critical reserve power applications and needs. Network power applications include communication/data networks, UPS systems for computers and control systems, electrical power generation and distribution systems, as well as a wide range of other industrial standby power applications. With a strong manufacturing base in both North America and Europe and a truly global reach (operations in more than 80 countries) in sales and service, GNB Industrial Power is best positioned to satisfy your back up power needs locally as well as all over the world.

Based on over 100 years of technological innovation the Network Power Division leads the industry with the most recognized global brands such as ABSOLYTE®, SONNENSCHEIN®, MARATHON®, SPRINTER®, RELAY GEL® and GNB FLOODED CLASSIC. They have come to symbolize quality, reliability, performance and excellence in all the markets served.

Exide Technologies takes pride in its commitment to a better environment. Its Total Battery Management program, an integrated approach to manufacturing, distributing and recycling of lead acid batteries, has been developed to ensure a safe and responsible life cycle for all of its products.

GNB Industrial Power

A Division of Exide Technologies

USA – Tel: 888.898.4GNB (4462)

Canada – Tel: 800.268.2698

www.exide.com

®

SECTION 92.80 2008-07

Image 29
Contents Page Table of Contents System Arrangements 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 14.0 14.1 15.0 15.1 List of Tables List of IllustrationsAppendices Appendix aGeneral Safety MessagesSulfuric Acid Burns Explosive GasesDelivery Information Installation ConsiderationsPage Table a Table B UnpackingSystem Arrangements System AssemblyUnpacking Modules Handling ModuleTip Over Procedure Beam Hardware Installation Beam Support InstalledTIP-OVER PROCEDUREFigure- SHACKLE9 -STRAP Usage Bottom Supports I-beamsHorizontal Stacking SHACKLE-STRAP Usage TIP-OVER Procedure Module After TIP-OVERElectrical Connections Installing Completed Hardware Horizontal StackPositioning Horizontal Base Modules TIE Plate Assemblies Horizontal StacksStack Connections Identification LabelsDescription QTY PER System Terminal Plate Kit Materials & AssemblyInitial Charge Protective Module CoversStep Table CDescription QTY PER System Module Clear Cover Materials and AssemblyRecommended Float Range @77F Battery OperationTemperature Correction Effects of Float Voltage Equalizing ChargeTable D Ohmic MeasurementsTable E RecordkeepingMaintenance Unit CleaningCapacity Testing TAP ConnectionsAbsolyte Battery Maintenance Report Type MANUF. Date Install Date System Voltage Battery Temperature C 104 105 106 107 108 109 110 111 112 113 100 103Appendix C Bonding & Grounding of Battery RackPage Exide Technologies Industry Leader